My WebLink
|
Help
|
About
|
Sign Out
052825 PARKS AND RECREATION COMMISSION AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
AGENDA PACKETS
>
2025
>
MAY 8, 2025
>
052825 PARKS AND RECREATION COMMISSION AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 10:27:55 AM
Creation date
5/12/2025 10:27:41 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 3 <br />Item #6 <br /> <br />PARKS AND RECREATION <br />COMMISSION AGENDA REPORT <br /> <br /> <br />May 8, 2025 <br />Library and Recreation <br /> <br />TITLE: REVIEW THE CONCEPTUAL DESIGN FOR IMPROVEMENTS TO THE <br />PROPERTY AT 4363 FIRST STREET IN RELATION TO THE LIONS WAYSIDE <br />AND DELUCCHI PARKS RENOVATIONS PROJECT, CIP NO. 06716 <br /> <br />SUMMARY <br />On September 14, 2023, the Parks and Recreation Commission recommended approval of the <br />conceptual design for the Lions Wayside and Delucchi Park improvements, CIP No. 06716. <br />The construction contract for the project was approved by the City Council on September 3, <br />2024, and construction began on October 1. An additional contingency of $250,600 was then <br />approved on December 3 to construct the bid alternates, including Delucchi Park <br />improvements, a trail on the 4363 First Street property, converting the lawn at the Firehouse <br />Arts Center, and associated stormwater pollution prevention plan (SWPPP) improvements. <br /> <br />The base bid portion of the project (Lions Wayside Park improvements) is now nearing <br />completion, and the contractor and staff have been able to keep unexpected costs down. <br />Considering the phase of construction and how much money remains in the project fund, <br />approximately $240,000, the trail improvements and Firehouse Arts Center lawn conversion <br />improvements could be combined with a parking lot and vehicular connection from First Street <br />to the Firehouse Arts Center parking lot through the 4363 First Street property (Attachment 1). <br /> <br />The improvements will create better access to downtown parking and will provide parking for <br />park events, such as the Summer Concert Series. The parking lot will also address the input <br />received during the public outreach process to balance the 4363 First Street property <br />improvements between parking and recreation. The construction of the parking lot, trail, and <br />lawn improvements will begin in June and is expected to be completed in late summer 2025. <br />Construction is not expected to impact the opening of the parks. <br /> <br />RECOMMENDATION <br />Review the conceptual design for improvements to the property at 4363 First Street in relation <br />to the Lions Wayside and Delucchi Parks Renovations Project, CIP No. 06716. <br /> <br />BACKGROUND <br />On February 7, 2023, the City Council directed staff to focus on constructing park <br />improvements utilizing the remaining budget of approximately $1.9 million. The proposed <br />improvements focused on a new bandstand and park updates. <br /> <br />Two conceptual plans were developed focusing on the bandstand's location, the style of the <br />bandstand, the associated park impacts, and incorporating public and council input from the <br />Master Plan update. The concepts were presented to the Parks and Recreation Commission <br />on September 14, 2023, and the Commission recommended a preferred design option. The <br />City Council ultimately approved a design, construction documents were created, and on <br />Page 24 of 29
The URL can be used to link to this page
Your browser does not support the video tag.