My WebLink
|
Help
|
About
|
Sign Out
052825 PARKS AND RECREATION COMMISSION AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
AGENDA PACKETS
>
2025
>
MAY 8, 2025
>
052825 PARKS AND RECREATION COMMISSION AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 10:27:55 AM
Creation date
5/12/2025 10:27:41 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 3 <br />September 3, 2024, the City Council awarded a construction contract for the improvements. <br />Construction began on October 1, 2024. <br /> <br />DISCUSSION <br />The contractor has worked with the city to minimize unforeseen construction costs and has <br />also been able to install additional items not included in the contract award, including electrical <br />accommodations for holiday and event lighting along the new trail in Lions Wayside Park, <br />dedicated lighting controls for the flagpole lighting, and replacement of previously damaged <br />sidewalk on Neal Street. Change orders totaling $208,850, including the above items, Delucchi <br />Park improvements, and the SWPPP, have been approved. <br /> <br />The Lions Wayside Park improvements are nearing completion with the turf installed in mid- <br />April, the bandstand installation started in late April, and the Delucchi Park improvements <br />expected to take place in May/June. Staff and the contractor believe that the remaining minor <br />construction changes, including a brick fascia for the existing Chan Henderson Bandstand, <br />could be combined and completed with the improvements proposed in the conceptual plan <br />(lawn conversion at the Firehouse Arts Center, trail through the 4363 First Street property, 24- <br />stall parking lot and parking lot connection and associated landscape and hardscape <br />improvements) utilizing the remaining construction contingency if the City Council approves the <br />use of the remaining fund balance of $72,860. Staff is requesting that the commission review <br />and comment on the design prior to presentation of the improvements to City Council for <br />approval. <br /> <br />The proposed schedule for the project remains the same with construction of Lions Wayside <br />and Delucchi Parks anticipated to be complete by July 4, 2025. However, the lawn conversion, <br />trail, and parking lot and parking connection at 4363 First Street are expected to be completed <br />later in the summer. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this action advances the Climate Action Plan (CAP 2.0) in Transportation and Land <br />Use by promoting an effective alternative transportation system with walking and bicycling and <br />providing greater park accessibility for all users. <br /> <br />OUTREACH <br />During the outreach for the master plan update, the feedback received from the public <br />regarding the use of the 4363 First Street property was to provide a balance of parking and <br />recreation. The proposed improvements include additional parking, a trail, and landscaping to <br />provide that balance. The trail, parking lot, and landscape will provide a finished look for the <br />park project while still providing an opportunity for future improvements to fully address public <br />outreach priorities once funding is available. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide ONE Pleasanton strategic plan goal of Investing <br />in Our Environment, Strategy 1 – Implement the four-year Capital Improvement Program (CIP) <br />to complete design and construction of budgeted capital projects, and Strategy 7 – Continue to <br />invest in parks, bicycle, and pedestrian infrastructure, and public art to improve traffic safety, <br />promote climate resilience, and increase equitable access to cultural and recreational <br />opportunities. <br />Page 25 of 29
The URL can be used to link to this page
Your browser does not support the video tag.