My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 2 CIP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 2 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:24:23 PM
Creation date
5/13/2025 4:12:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />IMM 1 . m: m ��i�n M1 1 111 <br />PLEASANTON, <br />Sewer Pipe Improvements - <br />Kamp Drive & Stoneridge Drive <br />Project Number: 28298 <br />Department: Public Works - <br />Utilities & Environmental Services <br />Project Phase: Design & Construction <br />Total Budget: $2,400,000 <br />CIP Rating Score: Enterprise <br />Project Description: <br />Project Justification: <br />This project upsizes existing 1,200 linear foot of 10 -inch The 2024 Sanitary Sewer System Capacity Evaluation <br />sewer pipe in Kamp Drive and Stoneridge Drive to 12 -inch. Report identified potential sewer overflows due to in- <br />sufficent capacity of the existing sewer main and for <br />future conditions associated with the development <br />from housing site updates and East Pleasanton. <br />Project Funding <br />Sewer Replace- 431 - - - $280,000 $2,120,000 - <br />ment CIP <br />74 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.