My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 2 CIP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 2 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:24:23 PM
Creation date
5/13/2025 4:12:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />M 1 . m: m ��i�n M1 1 111 <br />PLEASANTON, <br />Bernal Avenue Sewer Improvements - <br />Tawny Drive to Nevada Street <br />Project Number: 29299 <br />Department: <br />Project Phase: <br />Total Budget: <br />CIP Rating Score: <br />Project Description: <br />Public Works - <br />Utilities & Environmental Services <br />Design & Construction <br />$3,330,000 <br />Enterprise <br />This project upsizes 3,000 linear feet of 10 -inch sewer <br />pipe to 12 -inch in Bernal Avenue, and will connect the <br />sewer system in Bernal Avenue to the existing 18 -inch <br />sewer in Nevada Street via a new 12 inch pipe bridge <br />crossing over Arroyo Del Valle. <br />Project Funding <br />Sewer Replace- 431 <br />ment CIP <br />, <br />0, eP <br />z�? r <br />Project Justification: <br />The 2024 Sanitary Sewer System Capacity Evalua- <br />tion Report identified potential sewer overflows due <br />to insufficient capacity of the existing sewer main. <br />The project will increase capacity of the system. <br />$400,000 <br />$2,930,000 <br />City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.