My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 2 CIP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 2 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:24:23 PM
Creation date
5/13/2025 4:12:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />III <br />W �. m:m-��_f�M1 <br />11111 <br />PLEASANTON, <br />Sewer Pipe Improvements - <br />Stoneridge Mall <br />Project Number: 29200 <br />Department: Public Works - <br />Utilities & Environmental Services <br />Project Phase: Design & Construction <br />Total Budget: $3,660,000 <br />CIP Rating Score: Enterprise <br />Project Description: <br />This project upsizes 1,300 linear foot of 10 -inch sew- <br />er pipelines to 12 -inch in Stoneridge Mall Road and <br />Stonedale Drive. <br />Project Funding <br />Sewer Replace- 431 <br />ment CIP <br />Project Justification: <br />The 2024 Sanitary Sewer System Capacity Evalua- <br />tion Report identified potential sewer overflows due <br />to insufficient capacity of the existing sewer main <br />and for future conditions associated with the de- <br />velopment for Housing Element Rezone Site 2 at the <br />Stoneridge Shopping Center. <br />$470,000 $3,190,000 <br />76 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.