Laserfiche WebLink
Mr. Nelson Fialho/Mr. David Haglund Page 2 <br />Preliminary Issues Assessment of Potential Colocation of Maintenance Facilities <br />question can be fully answered. Working together with the City, the School District also has <br />the potential of acquiring land through the East Pleasanton Specific Plan process to address <br />future needs. In addition to a new school site, options exist for acreage to accommodate <br />maintenance operations adjacent to the City’s Operations Services Center. This strategy <br />would also create more collaborations and efficiencies, and fewer redundancies for the two <br />agencies due to their proximity to one another (e.g. meeting space, fueling stations, storage, <br />etc.). <br />2.Are shared services between the City and District feasible with co -located maintenance <br />facilities? <br />Summary answer: The focus of this study was shared capital facilities that enable <br />maintenance operations to be co-located at the City’s Operations Service Center (OSC) <br />and/or in proximity to the OSC for the reasons stated above. However, both parties <br />acknowledge that having maintenance functions nearby could eventually lead to sh ared <br />services agreements to benefit the City and District in the future. This would have to be <br />addressed separately and would necessitate meet and confer obligations with affected labor <br />groups, as well as a study of financial impacts and policy considerati ons by both governing <br />bodies. <br />3.What future needs may the City have as a result of growth and build out? <br />Summary answer: Population is expected to grow as the City reaches General Plan build out. <br />Beyond buildout, new State housing mandates may impact previous assumptions regarding <br />the City’s anticipated maintenance responsibilities which would necessitate the City’s need <br />to preserve currently unoccupied space at the OSC. The same impacts apply to the School <br />District regarding their ideal operational needs through build -out and beyond. Such growth <br />will come with maintenance requirements which will likely mean adding staff and <br />equipment. This is an important factor to be considered by the City in releasing property at <br />the Operations Services Center, and/or considering newly acquired property in East <br />Pleasanton in proximity to the OSC. Both considerations are note d in the report below. <br />4.Would having the District’s maintenance facilities in close proximity near the City’s <br />Operations Services Center be better than onsite integration with the City ? <br />Summary answer: Yes; this was identified as the preferred option during the discussions and <br />would need further study. It would also require the cooperation from East Pleasanton <br />property owners (Lionstone or Kiewit) through an approved Specific Plan process. The <br />concept discussed was for the District maintenance facilities to be located on vacant <br />property adjacent or across from the Operations Services Center which might create <br />opportunities for some shared capital facilities in the near term and potential shared services <br />arrangements in the long-term.