Laserfiche WebLink
CONSTRUCTION ITEM COST TOTALQUANTITY <br />BACKWATER VALVE 14 EA @ $1,200.00 $16,800 <br />EARTHWORK <br />RAW CUT 533 CY @ $1.00 $533 <br />RAW FILL 1967 CY @ $1.00 $1,967 <br />MOBILIZATION 1 LS @ $15,000.00 $15,000 <br />EROSION CONTROL 2 AC @ $3,500.00 $6,864 <br />FIRE WATER <br />8" PVC C900 (CLASS 235)419 LF @ $100.00 $41,900 <br />4" PVC C900 (CLASS 235)29 LF @ $60.00 $1,740 <br />8" DOUBLE CHECK DECTECTOR ASSEMBLY 1 EA @ $15,000.00 $15,000 <br />8x8x8 DI TEE 1 EA @ $1,000.00 $1,000 <br />DI BEND 10 EA @ $1,000.00 $10,000 <br />FIRE HYDRANT 1 EA @ $20,000.00 $20,000 <br />LANDSCAPING <br />TREE 5 GALLON 44 EA @ $19.21 $845 <br />TREE 15 GALLON 6 EA @ $108.77 $653 <br />TREE 24" BOX 9 EA @ $319.92 $2,879 <br />TREE 36" BOX 65 EA @ $447.87 $29,112 <br />TREE 48" BOX 1 EA @ $614.23 $614 <br />ELECTRICAL <br />JOINT TRENCH 563 LF @ $108.00 $60,804 <br />PVC ELECTRICAL CONDUIT 104 LF @ $26.00 $2,704 <br />SUB-TOTAL $1,995,715 <br />20% CONTINGENCY $399,143 <br />TOTAL $2,394,858 <br />PAGE 2 OF 2 <br />Page 171 of 682