My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2025 10:27:20 AM
Creation date
5/14/2025 10:18:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 9 <br />Capital Improvement Program <br />The Capital Improvement Program serves as a strategic resource allocation plan for capital <br />projects and promotes long-term planning. Capital investments are critical in building and <br />maintaining infrastructure for a livable, vibrant community. <br /> <br />The City updates its five-year Capital Improvement Plan (CIP) every two years, incorporating <br />both Capital Improvement (CIP) Projects and Repair and Replacement (R&R) initiatives. The <br />next CIP, covering fiscal years 2025/26 through 2029/30, will be presented for adoption in <br />June 2025. This cycle is guided by the newly adopted Capital Improvement Program <br />Prioritization Process (CIPPP) framework, approved by the City Council in December 2024. <br />The CIPPP introduced a more structured and transparent methodology for evaluating and <br />prioritizing projects based on objective criteria. <br /> <br />CIP projects typically involve new construction or major infrastructure replacements, while <br />R&R projects focus on sustaining the performance of existing assets. Deferred maintenance, <br />or the delayed upkeep of infrastructure, can significantly increase long-term costs and <br />heighten the risk of asset failure if left unaddressed. <br /> <br />Total capital expenditures and reserves recommended in the first two years of this CIP are <br />approximately $54.0 million for FY 2025/26 and $32.0 million for FY 2026/27 for a total of <br />$86.0 million over the two funded years of the CIP and a total of $221.7 million over all five <br />years. As noted in the budget message in the CIP book (Attachment 2), funding for enterprise- <br />funded water and sewer projects assumes rate increases and anticipated debt proceeds. <br /> <br />General Fund-Supported Projects <br />General Fund contributions are essential for maintaining the City’s core infrastructure, <br />particularly facilities, parks, and other assets not supported by enterprise or restricted funds. <br />Since the City has and continues to rely on a “pay-go” model (meaning the City relies on the <br />General Fund, not infrastructure bonds or other borrowing) for non-enterprise fund projects, it <br />is critical to set aside funds as capital needs continue to grow. The City has developed a <br />proposed five-year CIP amid significant infrastructure funding challenges. A Citywide call for <br />projects resulted in 27 General Fund supported CIP project requests totaling $53.4 million, as <br />outlined in the April 10, 2025, City Council meeting agenda packet. However, existing <br />reserves and projected contributions are insufficient to fund all requests without drawing on <br />Deferred Maintenance resources. Considering this funding gap, and with the Asset <br />Management Plan (AMP) scheduled for completion by December 2025, staff recommends <br />deferring most project funding decisions until the AMP provides a comprehensive, data-driven <br />prioritization of needs. In the interim, only the nine most critical urgent projects totaling $16.6 <br />million are recommended for funding in this cycle. These critical projects address regulatory <br />requirements, minimize the likelihood of facility closures, or are significantly grant-funded. <br /> <br />At the April 10, 2025, City Council meeting, staff recommended reallocating $2.0 million of the <br />FY 2025/26 General Fund CIP contribution to support repairs and replacements in the <br />Facilities Renovation Fund. This reallocation will extend the service life of critical community <br />assets such as the Dolores Bengtson Aquatic Center, Fire Station 2, and Bernal Synthetic <br />Fields, and other deferred maintenance which would otherwise require major capital <br />reinvestment if allowed to further deteriorate. This resulted in a total of $15.5 million from the <br />CIP General Fund in addition to the City's commitment of $30.3 million over the next five years <br />for Deferred Maintenance. The CIP fund will be applied to address the needs in the upcoming <br />Page 268 of 682
The URL can be used to link to this page
Your browser does not support the video tag.