Laserfiche WebLink
Page 6 of 9 <br />Asset Management Plan estimated at $900 million in infrastructure needs, including $500 <br />million in General Fund-supported assets. <br /> <br />Annual Core Projects <br />The CIPPP established Annual Core Projects, a recurring program essential to public safety, <br />regulatory compliance, and the reliable delivery of City services. These projects involve the <br />planned replacement of critical assets at the end of their service life and are excluded from <br />general prioritization due to their pre-established need and predictable nature. <br /> <br />Core projects are primarily funded from restricted sources tied to enterprise operations, with <br />the Annual Facility Replacement Program being the only General Fund-supported core <br />project. Unlike discretionary or one-time capital projects, core projects are systematic, planned <br />reinvestments that support the City's foundational infrastructure. Their recurring nature and <br />clearly defined purpose make them unsuitable for ranking through the broader prioritization <br />process; instead, their necessity is assumed based on operational mandates, industry <br />standards, asset life cycles, and past performance data. This approach ensures that the City <br />proactively addresses known infrastructure needs and avoids costly emergency repairs, <br />extends asset life, and ensures continuity of service. The proposed CIP includes eight new <br />core projects totaling $36.6 million, plus $21.0 million in enterprise-funded core projects and <br />$2.2 million for the Annual Facility Replacement Program. <br /> <br />Two new core programs are recommended for inclusion: <br />• Annual Traffic Button and Lane Marker Installation (CIP FY507) – Enhances roadway <br />safety and visibility. <br />• Annual Bicycle and Pedestrian Improvements (CIP FY543) – Advances projects in the <br />Bicycle and Pedestrian Master Plan using Measure BB funds. <br /> <br />Enterprise-Funded Capital Improvement Program <br />Projects for the City’s water and sewer utilities are funded through enterprise revenues and <br />are therefore excluded from the general prioritization process. These projects are defined and <br />prioritized through the Water System Management Plan and Sewer System Management <br />Plan. <br /> <br />The recently adopted Water System Management Plan and the in-process Sewer System <br />Management Plan identify significant capital needs over the next decade, including deferred <br />projects that will require new revenue sources and debt issuance. Rate studies are currently <br />underway to determine appropriate utility rate adjustments. The proposed enterprise-funded <br />projects totaling $70.8 million for water and $39.5 million for sewer reflect funding levels based <br />on staff-recommended rate scenarios, which will be presented to the City Council for <br />consideration. Final project approval and budget allocations will depend on the adopted rates. <br />Additionally, existing enterprise projects are proposed to be restructured and reallocated <br />under the updated plans. <br /> <br />Although the stormwater utility is structured as an enterprise program, it does not currently <br />generate sufficient revenue to be self-sustaining and has historically relied on General Fund <br />support. To address this, $1.7 million is proposed in the CIP to fund the development of a <br />comprehensive Storm System Master Plan and associated field investigations. These efforts <br />Page 269 of 682