My WebLink
|
Help
|
About
|
Sign Out
RES 2025036
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 5:12:14 PM
Creation date
7/8/2025 5:09:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/17/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 2025-036
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 5 – Design and Performance Provisions <br />City of Pleasanton Sewer System Management Plan, July 2025 23 <br />5.0: Element 5 – Design and Performance Provisions <br />The SSMP must include the following items as appropriate and applicable to the Enrollee’s <br />system: <br />a. Updated design criteria, and construction standards and specifications, for the <br />construction, installation, repair, and rehabilitation of existing and proposed system <br />infrastructure components, including but not limited to pipelines, pump stations, and <br />other system appurtenances. <br />b. Procedures, and standards for the inspection and testing of newly constructed, newly <br />installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and <br />appurtenances. <br />5.1: Design Criteria and Construction Standards <br />The City’s capacity and performance criteria for its sewer system are defined in the November <br />2024 Sewer Capacity Evaluation Report. The City’s construction standards for its sewer <br />system are defined in the July 2024 Standard Specifications and Details. These minimum <br />standards shall apply to the City’s capital improvement projects and private development <br />projects. These standards will be reviewed and updated periodically. <br />5.2: Inspection and Testing of New Facilities <br />The City’s July 2024 Standard Specifications and Details outlines the standards and <br />procedures for testing newly installed facilities in addition to applicable state standards. For <br />new facilities not addressed in the City’s Standard Specifications and Details, such as lift <br />stations, the City uses consultants to design improvements and identify inspection and testing <br />requirements. The City utilizes a combination of in-house staff and consultants to inspect and <br />oversee testing of new installations. <br />5.3: References <br />• WDR Attachment D – Section 5 <br />• City Standard Specifications and Details Standards, July 2024 <br />• Sewer Capacity Evaluation Report, November 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.