Laserfiche WebLink
Element 4 – Operations and Maintenance Program <br />City of Pleasanton Sewer System Management Plan, July 2025 22 <br />The Utilities Division maintains an inventory of routine parts for repair of sewer piping and <br />lift stations. Note that the City is in the process of developing a critical spare parts list at the <br />time of this SSMP Update. <br />Table 4–1: Major Vehicles and Equipment <br />Vehicles Equipment <br />Dump Truck, 1.5 ton w/ crane Camera Inspection, Crawler <br />Stake Bed LG (8Wx12Lx4H) Camera Inspection, Crawler <br />Step van CCTV Truck Pump Hose Trailer <br />Utility bed, 1-1/2-ton with mounted hoist and auxiliary fuel tank Sandbagger <br />12 ft. Dump Truck, 7-9 YD Traffic Arrow Board <br />Flusher 6" Trash Pump <br />Utility Truck w/Scelzi Body (air compressor 369 ER) Portable Generator 300kW <br />12 ft. Dump Truck, 7-9 YD Compressor <br />Hydro-Excavator Muddog Light Tower <br />Hydro Excavator Camel Portable Generator 400kW <br />Hydro Excavator (On Order) 4” Trash Pump <br />Dump Truck 7-9 YD Forklift <br />Dump Truck 7-9 YD Backhoe <br />Dump Truck 7-9 YD Backhoe <br /> Backhoe <br /> Equipment Trailer <br /> Bobcat Loader <br />4.5: Resource Evaluation <br />To properly implement the O&M program defined in this SSMP, the City will perform a <br />resource evaluation with an estimated completion date listed in Section 1.2. The resource <br />evaluation will consider reorganizing the Utilities Division structure to establish dedicated <br />sewer O&M staffing that is separate from dedicated water O&M staffing. The resource <br />evaluation will also review the adequacy of internal staffing, contract service <br />agreements/budgets, and vehicles/equipment. The results of the resource evaluation will <br />inform the sewer rate study, which has an estimated completion date listed in Section 1.2. <br />4.6: References <br />• WDR Attachment D – Section 4 <br />• NAASCO PACP