Laserfiche WebLink
Element 8 – System Evaluation, Capacity Assurance, and Capital Improvements <br />City of Pleasanton Sewer System Management Plan, July 2025 29 <br />8.0: Element 8 – System Evaluation, Capacity Assurance, <br />and Capital Improvements <br />The Plan must include procedures and activities for: <br />a. Routine evaluation and assessment of system conditions. <br />b. Capacity assessment and design criteria. <br />c. Prioritization of corrective actions. <br />d. A capital improvement plan. <br />8.1: Long-Term Capital Improvement Plan <br />The purpose of the City’s long-term capital improvement plan (CIP) is to ensure sustainability <br />of the sewer system’s infrastructure and determine funding needs. The long-term CIP is a <br />living plan that is reviewed on a 2-year cycle to evaluate implementation progress and updated <br />on a 6-year cycle to reflect any changes in drivers and needs. Development of the long-term <br />CIP is based on technical evaluations that include condition assessments and system capacity. <br />The long-term CIP includes prioritized projects with cost estimates over a 20-year span. The <br />long-term CIP is developed in coordination with Utilities Division O&M staff and <br />Engineering Division staff. <br />The City’s Engineering Division is responsible for implementing CIP projects. Engineering <br />will utilize the long-term CIP as a guide for developing its 5-Year CIP budget that is updated <br />every 2 years. <br />At the time of this SSMP Update, the City’s initial long-term CIP is in the process of being <br />prepared by Woodard & Curran and will be completed by the date shown in Section 1.2. <br />8.2: Condition Assessments <br />8.2.1: Gravity Mains <br />As discussed in Section 4, the City performs CCTV inspections of its gravity mains up to 15 <br />inches in diameter. As part of the condition assessment process, this inspection data is <br />evaluated for the purposes of identifying CIP projects. The latest evaluation was completed in <br />November 2024 by Woodard & Curran for pipes inspected and coded through June 2024. In <br />total, 424,370 linear feet (or about 30 percent of the City-owned pipes in the gravity collection <br />system) had CCTV data and defect scoring that could be utilized for a risk based assessment. <br />InfoAsset Planner risk assessment software was used to develop likelihood of failure (LOF) <br />and consequence of failure (COF) scores for each pipe in the system. LOF scoring was based <br />on structural condition based on CCTV data, a “structural vulnerability” factor reflecting the <br />age and material of the pipe (also used as a preliminary surrogate for structural condition for <br />pipes without CCTV data), and frequency of required cleaning (“hot spots”). COF scoring <br />considered the pipe size (reflecting its potential flow volume), environmental consequence