My WebLink
|
Help
|
About
|
Sign Out
RES 2025036
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 5:12:14 PM
Creation date
7/8/2025 5:09:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/17/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 2025-036
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 8 – System Evaluation, Capacity Assurance, and Capital Improvements <br />City of Pleasanton Sewer System Management Plan, July 2025 31 <br />station improvements based on the results of the lift station condition assessments were <br />prioritized and will be scheduled into the City’s long-term CIP. <br />The East Amador Lift Station (EALS) which is owned and operated by Dublin-San Ramon <br />Services District (DSRSD), conveys flow from the City of Pleasanton to the DSRSD <br />Wastewater Treatment Plant. Although DSRSD is responsible for the condition assessment <br />and implementation of improvements needed to this lift station, the City is responsible for <br />funding these improvements. An allocation for those costs will be included in the long-term <br />CIP. <br />8.2.4: Force Mains <br />Force mains are inspected as discussed in Section 4. Due to the challenges of inspecting force <br />mains, the City will also include an engineering evaluation as part of its long-term CIP <br />process. The evaluation will first include a desktop assessment of the force mains, which will <br />include a review of pipe attributes (alignment, age, material, etc.), geotechnical conditions in <br />the proximity of the force mains, pump cycling data, and break history. This analysis will help <br />identify feasible and appropriate inspection methods for each force main. The inspections will <br />be prioritized based on the same types of factors used for gravity pipe risk assessment. The <br />force main inspections may include visual assessment of pipe alignments, inspection of <br />discharge manholes, ultrasonic pipe thickness testing, and actual internal CCTV inspection or <br />other technology to assess pipe condition. Any force mains that can be CCTV inspected (or <br />partially inspected) may be added to the gravity pipe CCTV inspection program to be <br />conducted by contractors. Once available, needed improvements based on the results of the <br />condition assessments will be prioritized and scheduled into the City’s long-term capital <br />improvement plan as appropriate. <br />Evaluation of the City’s force mains were not performed as part of the City’s current CIP. <br />Budget for these inspections and condition assessments will be included in the long-term CIP <br />currently under development. Results of the inspections will be evaluated, and recommended <br />improvements included in future 2-year reviews and 6-year updates of the long-term CIP. <br />8.3: Capacity Assessments <br />The City completed a Sewer Capacity Evaluation Report in November 2024 by Woodard & <br />Curran, which summarizes the development of a calibrated hydraulic model used to analyze <br />the capacity of the system, identify areas of capacity deficiencies, and develop <br />recommendations for capacity improvements to be incorporated into the City’s long-term CIP. <br />Note that the City has not had any capacity-related spills from the sewer collection system. <br />8.3.1: Hydraulic Analysis <br />The hydraulic model was developed in InfoWorks ICM modeling software and includes all <br />active City-owned sewers, lift stations, and force mains in the system. Flows in the model <br />were based on recent winter water use data (to estimate base wastewater flows) and flow <br />monitoring data collected at 14 sites and during the 2022/23 wet weather season. The model
The URL can be used to link to this page
Your browser does not support the video tag.