My WebLink
|
Help
|
About
|
Sign Out
RES 2025036
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 5:12:14 PM
Creation date
7/8/2025 5:09:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/17/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 2025-036
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 9 – Monitoring, Tracking and Reporting System <br />City of Pleasanton Sewer System Management Plan, July 2025 34 <br />9.0: Element 9 – Monitoring, Tracking and Reporting <br />System <br />The SSMP must include an Adaptive Management section that addresses SSMP <br />implementation effectiveness and the steps for necessary SSMP improvement, including: <br />a. Maintaining relevant information, including audit findings, to establish and prioritize <br />appropriate Plan activities. <br />b. Monitoring the implementation and measuring the effectiveness of each element of the <br />Plan. <br />c. Assessing the success of the preventative operation and maintenance activities. <br />d. Updating Plan procedures and activities, as appropriate, based on monitoring and <br />performance evaluation. <br />e. Identifying and illustrating spill trends, including spill frequency, locations, and <br />estimated volumes. <br />9.1: Adaptive Management <br />The City regularly tracks and updates the performance results of its sanitary sewer program. In <br />March of each year, the SWRCB requires that the City prepare and submit an Annual Report <br />of its findings in CIWQS. During preparation and prior to certification of the Annual Report, <br />the City will also perform the following related activities: <br />• Review the SERP for effectiveness and make any changes to ensure proper and timely <br />responses. <br />• Evaluates the SSMP Audit Report’s corrective actions to monitor implementation <br />status. <br />• Report on key performance indicators summarized in Table 9-1 and update <br />performance tracking graphs (see Appendix B). <br />• Document any required SSMP changes in the SSMP Change Log. <br />9.2: References <br />• WDR Attachment D – Section 9 <br />• Appendix B – Spill and Operational Performance Tracking <br />
The URL can be used to link to this page
Your browser does not support the video tag.