My WebLink
|
Help
|
About
|
Sign Out
RES 2025036
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 5:12:14 PM
Creation date
7/8/2025 5:09:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/17/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 2025-036
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 9 – Monitoring, Tracking and Reporting System <br />City of Pleasanton Sewer System Management Plan, July 2025 35 <br />Table 9–1: Key Performance Indicator Targets per Calendar Year <br />Key Performance Indicator Target <br />Regulatory Compliance <br />• Number of Spills 5 <br />• Spill Reports Completed on Time 100% <br />• Annual Report Completed on Time 100% <br />• SSMP Audit Completed on Time 100% <br />• SSMP Update Completed on Time 100% <br />Spill Response <br />Response Time (receipt of call to arrival at site) <br />• During Business Hours Less than 30 min 95% of the time <br />• After Business Hours Less than 90 min 95% of the time <br />Spill Recovery Volume (average) 75% <br />Spill Reduction <br />Number of Repeat Spills 0 <br />Inspections & Maintenance <br />• Gravity Mains & Manhole Cleaning and Inspections <br />Completed <br />7-Year Cycle <br />(190,000 linear feet/year of piping and <br />respective manholes) <br />• Lift Station Inspections Completed 75% <br />• Force Main Inspections Completed <br />o Yearly Alignment Walks <br />o Quarterly Vault/ARVs <br /> <br />100% <br />75% <br />• Open vs. Total Work Orders 25% <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.