My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
060325 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 11:40:48 AM
Creation date
7/15/2025 11:39:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/3/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Sewer Pump Repairs <br />Page 2 of 3 <br /> <br />• Guide Rails: Inspect overall condition <br />• Lifting Chain/Cable: Inspect condition. When removing or installing, verify <br />proper securement and hanging. <br />• Pump Lifting Handle: Inspect condition <br />• Motor Electrical Inspection: Perform Megger readings and voltage/amp checks <br />under both load and no-load conditions <br />• Stator Housing: Confirm there is no oil or water present inside the housing <br />• MiniCAS/MAS Unit/Other: Test to confirm proper operation, if applicable <br />• Pump Station Operation: Check and verify flow performance of the pump, <br />where applicable <br /> <br />7. The Contractor’s Service technician(s) shall communicate with the City’s designated <br />Project Manager any conditions that warrant immediate attention that will affect the <br />present and potential conditions of the pumps. <br /> <br />8. For repairing and replacing submersible sewer pumps at eight (8) of our sewer lift stations <br />in our collections system <br /> <br />9. For repairing and replacing submersible storm water pumps at one (1) of our storm water <br />lift stations <br /> <br />10. Provide troubleshooting and repairs to pumps and motors of varying voltage and phases. <br /> <br />11. Perform work on sewer pumps varying in size from 2 H.P. to 80 H.P. <br /> <br />12. Troubleshoot and repair any controllers and accessories associated with collections system. <br /> <br />13. Contractor to provide a pump inspection report with all correctly verified information <br />including detailed findings while performing maintenance. <br /> <br /> <br />RATE SHEET <br />The cost quoted below shall include all taxes and all other charges, including travel expenses, <br />and is the cost the City will pay for the term of any contract that is a result of this bid. <br /> <br />Bidder hereby certifies to City that all representations, certifications, and statements made by <br />Bidder, as set forth in this Bid Form and attachments are true and correct and are made under <br />penalty of perjury pursuant to the laws of California. <br /> <br />Contractor's Labor Rates (Hourly) <br />Position Description Regular Time Overtime Emergency Callout <br />Foreperson $ $ $ <br />Journey Level $ $ $ <br />Page 168 of 226
The URL can be used to link to this page
Your browser does not support the video tag.