My WebLink
|
Help
|
About
|
Sign Out
ITEM 16 ATT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
ITEM 16 ATT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:19:10 PM
Creation date
8/6/2025 9:47:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
costs; non-availability of labor, material or equipment due to delays; or any other indirect <br />loss arising from the Contract. <br />7-09. Multiple Claims <br />In the interest of efficiency, City, acting in its sole discretion, may elect to process <br />multiple Claims concurrently, in which case the applicable procedures above will be <br />based on the total amount of such Claims rather than the amount of each individual <br />Claim. Any such election will not operate to change or waive any other requirements of <br />this Section. <br />7-10. Other Disputes <br />The procedures in this Section 7 will apply to any and all disputes or legal actions, in <br />addition to Claims, arising from or related to this Contract, unless and only to the extent <br />that compliance with a procedural requirement is expressly and specifically waived by <br />City. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.