Laserfiche WebLink
SPECIAL PROVISIONS <br />(These Special Provisions are to be used in conjunction with <br />the City Standard Specifications and Standard Details, and <br />the State Standard Specifications and Standard Plans) <br />All work shall be constructed in accordance with the City of Pleasanton Standard <br />Specifications and Details dated July 2024, and as augmented by these Special <br />Provisions. The Sections noted are those in the Standard Specifications except for the <br />new Section(s) added. Where conflict exists between these documents and existing <br />conditions, request clarification from the Project Engineer. <br />SECTION 1. GENERAL <br />1-06 Protection of Existing Utilities and Property <br />Add: <br />All utility vaults belonging to PG&E, and other utility companies shall be adjusted to <br />grade by each corresponding utility owner. The Contractor shall contact and coordinate <br />adjustments (lower/raise) with the utility companies at no additional cost to the City. <br />1-16 Lines and Grades and Construction Staking <br />Replace: `In the case of City projects, the City will provide the staking and marking' with <br />`The Contractor shall provide the staking and markings if necessary. <br />1-18 Working Hours <br />Work on West Las Positas Boulevard that may impact traffic shall be completed between <br />9:00 am to 2:00 pm when school is in session (between the bell schedule on the <br />Pleasanton Unified School District's website at https://www.pleasantonusd.neLo. <br />See Section 2-01E for additional information on traffic control restrictions. <br />1-20 Permits and Licenses <br />Prior to the start of any work for this project, the contractor shall apply and obtain a "no <br />fee" encroachment permit from the City of Pleasanton's Public Works Department, at 200 <br />Old Bernal Ave, Pleasanton, CA. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 49 <br />