My WebLink
|
Help
|
About
|
Sign Out
ITEM 16 ATT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
ITEM 16 ATT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:19:10 PM
Creation date
8/6/2025 9:47:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mx49IsP►IPA 9:7_1aa[00d6P►kIZ1611 <br />2-01D Traffic Control Plan <br />Add: <br />The contractor shall provide the Engineer with traffic control plans (TCP) and Pedestrian <br />Access Plan on West Las Positas Boulevard, Gibraltar Drive and Foothill Road. <br />2-01E Traffic Control Restrictions <br />Add: <br />Any work within a school zones (750 feet of a school) that impacts the vehicular and <br />pedestrian travel lanes and sidewalk/ramps shall only be allowed while school is in <br />session (between the bell schedule on the Pleasanton Unified School District's website at <br />https://www.pleasantonusd.net/) or between 9:00 am to 2:00 pm whichever is more <br />restrictive. Modifications of restrictions shall be subject to review by the Engineer on a <br />case-by-case basis. If the school is not in session (spring break, holidays, weekends. etc.) <br />lane restrictions are allowed between 8:00 am to 5:00 pm. <br />Driveway/Private Road access shall be maintained at all times maintaining a 10 -foot wide <br />vehicle access. The contractor shall provide a plan showing how they plan to keep the <br />access open per Engineer's request and the plan may include but not limited to the use of <br />plating, high early strength concrete and/or performing the work phased. <br />Concrete at driveways shall be protected for a minimum of three days before vehicular <br />traffic can be restored unless the use of high early strength concrete is utilized, and <br />concrete reaches a minimum 2,500 PSI compressive strength. Residential driveways <br />upon confirmation from property owner (confirmation shall be submitted to City) may be <br />closed for three days if street parking is available in front of the residence. <br />2-02 Pedestrian Access Plan <br />The contractor is to provide a pedestrian/ADA access plan for various construction <br />phases. The site-specific pedestrian circulation plans are typically requested at high <br />pedestrian accumulation areas such as near schools, businesses, etc., at the discretion of <br />the Engineer. No demolition work for pedestrian access is to be initiated until a <br />pedestrian access plan is approved and all detour measures are in place and operational. <br />The Contractor shall pay special attention to pedestrian access at work location within the <br />school area. Contractor shall schedule work for only one ramp to be under construction at <br />any time in an intersection when school is in session to allow safe pedestrian travel, <br />unless approved otherwise by Engineer. <br />A minimum of I I -foot-wide travel lanes in all directions shall be maintained at all times <br />during construction. <br />ADA curb ramp replacement on West Las Positas Boulevard are restricted as follows: <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.