Laserfiche WebLink
The project plans show the approximant location of curb and gutter removal limits. <br />Actual limits shall be marked in the field and verified by contractor prior to saw cutting, <br />Some of the ramps that are located at the intersection of sloping streets (typically <br />anything greater than 5%) will generally require enlargement of the side areas of the <br />ramp or extension of the ramp "wing" to ensure meeting ADA and City Standards. This <br />longer wing requirement typically happens only on one side of the ramp, however, it can <br />occasionally also happen on both sides of the ramp, depending on the actual terrain and <br />location of the ramp. At these locations, the final grades will be confirmed and/or <br />provided by the engineer during construction and shall be considered by the contractor <br />when submitting their bids. The City shall limit the wing length on each side of the ramp <br />to a maximum of 15 feet, plus the additional length to the nearest control/score joint. The <br />enlargement or extension of ramp wings (to the above-mentioned limit) typically only <br />happens at sloped streets and shall be considered part of the limit of work for the ramp; <br />no separate payment shall be allowed. <br />ADA ramps that are to be removed shall include the removal of existing groove marks <br />and shall be considered part of the limits of work for the ramp; no separate payment shall <br />be allowed. <br />At Gibraltar Drive and Willow Road ADA ramps replacement involve the removal and <br />resetting existing brick paver on cross walks. The Contractor shall remove and salvage <br />these brick pavers for resetting upon the completion of ADA ramps replacement. <br />Limited brick pavers are available at the City's Operation Service Center for resetting if <br />needed. The limit of pavers removal and resetting varies from 1 foot to 3 foot from the <br />ADA curb ramp to provide a smooth conform at a cross slope not greater than 4%. <br />Resetting pavers shall be considered part of the work and no separate payment shall be <br />allowed. <br />Where existing traffic and/or street light poles are within the new concrete improvement, <br />concrete shall be poured to the bottom of the existing base of the traffic signal and/or <br />streetlight with an expansion joint around existing pole foundation. Non -Shrink grout <br />shall be placed between traffic and/or streetlight base plate and new concrete pad and/or <br />existing traffic/lighting footing. No separate payment shall be allowed. <br />The contractor is made aware that the existing concrete curb and gutter proposed for <br />removal and replacement generally have water ponding issues. It is therefore important <br />that the contractor, prior to the removal of the concrete as called out on the plans, <br />complete the field verification by using a leveling instrument of their choice, that there <br />shall be a positive flow achieved with the proposed removal and replacement of the <br />existing concrete curb and gutter. Any discrepancies between the field verification and <br />the proposed work as identified on the plans shall be brought to the attention of the <br />Engineer. The objective is to remove the low points and high points that cause water <br />ponding; however, it is also necessary and important to make sure that ponding is not just <br />transferred or shifted to an adjacent area. The only final product meeting this positive <br />flow verification requirement shall be considered for payment. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 53 <br />