SECTION 8. ASPHALT CONCRETE, LIQUID ASPHALT AND ASPHALTIC <br />EMULSION <br />8-04 Measurement <br />Asphalt concrete, liquid asphalt and asphaltic emulsion shall not be a measured item with <br />regards to the removal and replacement of curb, gutter, sidewalk, center median curb, <br />driveway and access ramp construction including the 1 -foot curb cut or conform as <br />shown on the plans. Asphalt concrete, liquid asphalt and asphaltic emulsion associated <br />with work with lump sum work shall not be a measured item. <br />SECTION 15. CONCRETE SURFACE IMPROVEMENTS <br />15-03 Construction <br />15-03B Saw cutting Existing Concrete <br />Replace section. <br />Where a portion of existing concrete surface improvements is to be removed and <br />replaced, the section to be removed shall be sawcut with an approved concrete saw to a <br />minimum depth of 2 inches. For sidewalks and driveways, the limit of the saw cut shall <br />be at a minimum the first score line beyond the limits of the areas to be replaced. For <br />ADA access ramps the limit of area to be replaced shall be extended to the first score line <br />beyond the limits of area to replace unless it falls within 6 inches of the existing score <br />line in which the saw cut may be made at top of new ramp wing. If existing groove lines <br />at top of existing ramps are not included in areas of removal the limit shall be moved to <br />include groove lines. For curb and gutter, the limit of the sawcut shall be per the marked <br />location in the field verified by contractor and approved project inspector. <br />Add: <br />15-03K Stamps and Markings <br />All curb through -drains, sewer lateral stamps ("s"), water valve markings ("w" & "rw"), <br />address markings and colored curb markings destroyed or removed during the removal or <br />replacement of curb shall be replaced in kind regardless if identified on the plans. <br />15-03L Sequence of Work <br />Concrete shall be placed and completed within four (4) working days from the day <br />demolition work begins at each location unless otherwise directed by the Engineer. All <br />sidewalk and ADA ramps shall be re -opened to the public prior to any Holiday <br />weekends. All work within school zones shall be completed without more than 24 hours <br />between operations unless approved by Engineer. <br />15-03M Special Instructions/Considerations <br />The project plans only show schematic drawings of the proposed access ramps. The plans <br />may also show an access ramp centerline being adjusted to fit the current situation with <br />an approximate adjustment value. Not all of the existing utility boxes are shown on the <br />plans, however, it is anticipated that these utility boxes shown or not shown may need <br />adjustment to fit the proposed ramp. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 52 <br />