Laserfiche WebLink
Pouring new concrete to the bottom of the existing base of the traffic signal and/or <br />streetlight, grout and expansion joint; shall not be considered a bid item and no separate <br />payment shall be allowed. <br />Soil and mulch used in conjunction with construction of access ramp, sidewalk, curb and <br />gutter shall NOT be a measured item. <br />All work and delays associated with the Tree Root Inspection by City Arborist including <br />maintaining the area after removal before placement shall NOT be a measured item. <br />Installing #4 rebars shall not be a measured item. <br />Curb through drains shall NOT be a measured item. All curb through drains may not be <br />shown on plans. <br />Sewer lateral stamps, water valve markings, address markings and colored curb markings <br />shall NOT be a measured item. <br />Coordination work with property owners, utility companies, clearing and grubbing of <br />hedges, lawns and decorative stones including tying in on existing irrigation system, <br />modifying existing irrigation system, installing new irrigation system and the installation <br />of a new lawn, landscape or new concrete surfacing shall NOT be a measured item. <br />Adjustments of curb reveal height or curb face shall NOT be a measured item. <br />Painting of the new curb face or to match existing shall NOT be a measured item. <br />Saw cutting of concrete and asphalt concrete for the construction of curb and gutter, <br />driveway and access ramps shall NOT be a measured item. <br />All work associated with verifying and checking for positive drainage flow for curb and <br />gutter construction is NOT a measured item of work and payment shall be considered as <br />included in the various contract items of work requiring such removal and replacement <br />and no separate payment shall be allowed. <br />Standard 1 foot asphalt concrete (AC/HMA) used in conjunction with the construction of <br />curb and gutter, driveway, access ramps shall NOT be a measured item. <br />Concrete curb and gutter along the construction limits of an access ramp shall NOT be a <br />measured item. This shall be considered part of the ADA ramp construction. <br />Concrete curb and gutter with rebar and angle bars, valley and rolled curbs shall be <br />measured as regular concrete curb and gutter. <br />At locations where the concrete/decorative materials between the back of curb and <br />sidewalk are required to be removed for the installation of the access ramps, these areas <br />are to be considered as included in the access ramp construction and shall not be <br />measured. <br />Annual Curb & Gutter for Street Resurfacing Project, CIP No.25509 Page 56 <br />