Laserfiche WebLink
City of Pleasanton <br />Emergency Generator Replacement Proposal <br />April 14, 2025 <br />Page 7 of 9 <br />Task 7 – Hazardous Materials Management Plan Support $7,897 <br />Wood Rodgers will assist the City of Pleasanton to prepare the Hazardous Materials <br />Management Plans for each of the sites as required for the Fire Marshall Submittal to <br />comply with storage of diesel fuel onsite. A total of 30 hours has been allocated for <br />assistance at a Principal I level billing rate. <br />Task 8 – Bid Phase Services $17,078 <br />Wood Rodgers will prepare a set of biddable contract documents for public bidding <br />of the project. Our project team will provide clarity on the design intent, answer <br />questions on the contract documents and produce up to two addenda for the project. <br />Wood Rodgers will prepare an agenda for and facilitate the Pre-Bid meeting. <br />Deliverable(s): Pre-Bid Meeting agenda preparation, evaluate bids, provide <br />recommendation on bid results <br />Task 9 – Construction Phase Services $56,850 <br />Wood Rodgers will provide engineering support services during the construction <br />phase of the project on a time and materials basis per the City’s request. Anticipated <br />services will include: <br />•Generator/Electrical Equipment Submittal Review – Our electrical engineer <br />subconsultant will provide review and response of shop drawings submitted <br />for the generator and electrical equipment. This task assumes up to 10 <br />submittals (including re-submittals). It is assumed that the City will review <br />any submittals related to civil items (i.e. reinforcement, concrete mix, <br />pavement mix, aggregate base, etc.) <br />•RFI Review – This task assumes up to 40 hours of support to review and <br />respond to contractor submitted Requests for Information (RFIs). <br />•Change Order Support – This task assumes up to 20 hours of support to <br />prepare and review scopes for project change orders. <br />•Site Visits – Our team will conduct up to 5 site visits for electrical inspections. <br />Each site visit is assumed to be 4 hours per visit. Our team will conduct 1 site <br />visit for punch list review, assumed to be 8 hours. <br />•BAAQMD Permit Compliance Assistance – Wood Rodgers will prepare a <br />radius offset map and marked-up/compiled pertinent drawings for the <br />application (for each site). Wood Rodgers will complete the BAAQMD <br />application for “Authority to Construct” (ATC) Stationary Emergency <br />Generator. The following BAAQMD forms will be provided with the ATC <br />Application: <br />•P101b form (General Facility and Contact Information) with <br />Contractor company information. <br />EXHIBIT A <br />Docusign Envelope ID: 30A3961D-FFFB-4F58-8CEA-FDACAFB45868