My WebLink
|
Help
|
About
|
Sign Out
WOOD RODGERS, INC. (#2025562)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WOOD RODGERS, INC. (#2025562)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:28:56 AM
Creation date
8/11/2025 11:26:43 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
WOOD RODGERSM, INC.
Contract Record Series
704-05
Munis Contract #
2025562
Contract Expiration
12/31/2027
NOTES
CONSULTANT PROVIDING ENGINEERING AND BID SUPPORT SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br />Emergency Generator Replacement Proposal <br />April 14, 2025 <br />Page 6 of 9 <br />Our project team will review the previous Predesign report authored by TJC for the <br />replacement of the emergency generators. That review will involve confirmation of <br />the sizing criteria for the generators, loading that was arrived at and City input on the <br />size and capacity of the generators. <br />Subtask 4.3b – Site Visit to confirm existing data $9,064 <br />Our project team will make a site visit to each of the sites to evaluate those locations, <br />existing infrastructure and existing site conditions. The site visit will include taking <br />notes, taking pictures of the sites and equipment layout, checking proximity of <br />physical features, documenting location of power pole and turn around access for fuel <br />trucks. <br />Subtask 4.3c – Preparation of Design Criteria Technical Memorandum $11,297 <br />Our project team will author a Technical Memorandum (TM) on confirmation and <br />validation of the design approach for the project. This TM will include a summary of <br />the design criteria to be applied for the project based on City of Pleasanton and <br />industry standard requirements. The TM will provide a path forward for design and <br />construction of the generators for each of the sites included for the project. <br />Deliverable: Draft and Final TM (PDF) <br />Subtask 4.3d – Facility Design and Preparation of Bid Documents $106,908 <br />Our project team will develop design elements for the generators at each of the sites <br />in preparation of the bid documents for the project. The design will include plans and <br />specifications for a competitive bid for the generator replacement project. <br />Deliverable: 65%, 95%, and 100% Design Submittals and Cost Estimate (PDF) <br />Task 5 – Building Department Review $13,602 <br />Wood Rodgers will prepare a review set of contract documents for building <br />department review. Our project team will provide response to comments from the <br />building department review and we have budgeted for resubmittal a total of two times <br />for approval of the project. <br />Deliverable(s): Addressing review comments and two resubmittals of contract <br />documents <br />Task 6 – Fire Department Review $21,920 <br />Wood Rodgers will prepare a review set of contract documents for fire department <br />review. Our project team will provide response to comments from the fire <br />department review and we have budgeted for resubmittal a total of two times for <br />approval of the project. <br />Deliverable(s): Addressing review comments and two resubmittals of contract <br />documents <br />EXHIBIT A <br />Docusign Envelope ID: 30A3961D-FFFB-4F58-8CEA-FDACAFB45868
The URL can be used to link to this page
Your browser does not support the video tag.