Laserfiche WebLink
City of Pleasanton <br />Emergency Generator Replacement Proposal <br />April 14, 2025 <br />Page 4 of 9 <br />Agendas and meeting minutes will be prepared to assist with facilitation of meetings and <br />documentation of key discussion points and action items. These will be utilized for <br />referencing to maintain continuity throughout the progression of project. <br />Deliverable: Meeting agendas and meeting minutes (PDF) <br />Task 3 – Information Review and Preliminary Evaluation $10,447 <br />This task will involve data gathering, investigation and evaluation of each facility’s <br />capacity and reliability in order to approach the work in a systematic and efficient <br />manner. Wood Rodgers will submit a request for information, collect and review all <br />available information relative to the project. <br />•Review the City’s existing information documentation for each Pump Station or <br />Lift Station (record drawings, O&M manuals, current setpoints, pump operating <br />schedules/frequencies, etc.) <br />•Develop a list of additional information requested from the City. <br />Each of the facilities will be equipped with a Tier 4 diesel powered emergency generator. <br />In order to fully embrace the general requirements and all of its elements we plan the <br />following: <br />•Engage in a thorough discussion with City engineering and operations staff to <br />gain a full understanding of the upgrades desired, both present and future <br />•Evaluate information of project for implementation into the design and program <br />requirements <br />•Evaluate interruption of the facility and sequencing of the work <br />•Prepare a schedule with evaluation of construction period timing <br />•Evaluate permitting for the generators to meet BAAQMD requirements <br />Task 4 – Design <br />Our project team will provide civil, structural, mechanical, electrical, and instrumentation <br />design services for preparation of detailed construction drawings and specifications. <br />Design shall include existing site and site improvements plans, demolition plan, structural <br />criteria, mechanical equipment, electrical single-line diagram, electrical equipment panel <br />elevations, installation details, and specifications for contractor understanding of <br />requirements for bidding and construction. <br />Each of the specific discipline design efforts are described as follows: <br />Subtask 4.1 - Civil Site Design $54,065 <br />Wood Rodgers will create base mapping from the survey information either provided <br />by the City or obtained as a part of this contract. The base mapping will include the <br />EXHIBIT A <br />Docusign Envelope ID: 30A3961D-FFFB-4F58-8CEA-FDACAFB45868