City of Pleasanton <br />Emergency Generator Replacement Proposal <br />April 14, 2025 <br />Page 5 of 9 <br />location for the permanent generators and automatic transfer switches on each of the <br />sites with dimensional information and coordinates tied to the site for construction. <br />The layout of the new facilities will be cognizant of existing traffic circulation and we <br />will take steps to provide for traffic to the equipment for maintenance activities. The <br />generator concrete pads will be located with the new facilities tied into the existing <br />storm water drainage system. Design will also include trenching for installation of <br />the conduit for power and signal to the generator locations as required. <br />Deliverable: 65%, 95%, and 100% Design Submittals (PDF) <br />Subtask 4.2 - Structural Design $16,501 <br />Wood Rodgers will provide structural design calculations and drawings for Generator <br />Mattress slab foundations and Electrical Cabinet foundation slabs located at four (4) <br />Water Station facilities and two (2) Sewer Station Facilities. Seismic accelerations will be <br />determined for each project site based on site coordinates. Generator and electrical <br />equipment anchorage to the foundation slabs will be treated as Deferred Submittals and <br />designed by others. <br />The City will provide historical or current geotechnical reports to Wood Rodgers for the <br />determination of geotechnical design parameters of the foundation slabs. If geotechnical <br />report(s) are not available, Wood Rodgers will use geotechnical design parameters will <br />be based on the Presumptive Load Bearing Values 2022 California Building Code Table <br />1806.2 and Lateral Soil Load Table 1610.1. <br />Deliverable: 65%, 95%, and 100% Design Submittals (PDF) <br />Subtask 4.3 – Electrical, Instrumentation and Control Design <br />Electrical design will be in close collaboration with the project team and the City of <br />Pleasanton. The design will include interface with existing SCADA PLC for <br />complete remote monitoring of the gensets and auxiliary systems. It is assumed that <br />as-builts of the existing SCADA PLC at each site are available for our use in the <br />design. Since the existing PLC I/O list will be specifically updated for each site, no <br />P&ID drawings are required. Updated PLC programming logic if needed will be <br />specified to be done by Tesco hired directly under the Contractor’s contract as his <br />sub. The new generators will be all Tier 4 diesel unit with subbase fuel tank. <br />Enclosure for genset will be noise attenuated and quieter than the existing portable <br />gensets. Contractor shall submit applications and obtain air permits on the City’s <br />behalf. <br />The work can be broken down into smaller subtasks as follows: <br />Subtask 4.3a – Brief Review of TJC Predesign Report $5,070 <br />EXHIBIT A <br />Docusign Envelope ID: 30A3961D-FFFB-4F58-8CEA-FDACAFB45868