Laserfiche WebLink
<br />The City will not pay for travel time. Any Contractor desiring to cover these costs will need to <br />incorporate them in the applicable hourly rates. <br /> <br /> Uniforms <br />The contractor’s employee(s) shall be identified at all times by a Company uniform or a safety <br />vest worn outside other clothing with the Company name clearly displayed. Vehicles will have a <br />Company sign clearly displayed. Uniform to include all required hi-visibility apparel (safety vest <br />etc.). <br /> <br />Permits <br />The contractor will be responsible for obtaining all necessary permits to perform work <br />(encroachment permits, etc.). Before beginning work, all stump grinding and tree planting <br />locations shall be surveyed for underground utilities (USA North 811). Any identified utility <br />conflicts will be discussed with the Parks Division Manager before proceeding with any ground <br />disturbance work. <br /> <br />Traffic Control and Vehicle Access <br />When working in street locations and transporting equipment on public streets, the Contractor <br />shall comply with the California State Vehicle Code. Contractors must provide all safety cones, <br />sign boards, arrow boards, and other appropriate measures and equipment as prescribed by the <br />California Manual on Uniform Traffic Control Devices (CA-MUTCD) for traffic control. <br />Contractor shall conduct its operations to cause the least possible obstruction and inconvenience <br />to public traffic. To the greatest extent possible, all traffic shall be permitted to pass through the <br />work area. For work requiring traffic control, the Contractor must submit a traffic control plan to <br />the City of Pleasanton Public Works Department for approval 72 hours before the scheduled <br />work. <br /> <br />When working in a park, vehicle access is limited to the sidewalk. The contractor shall not drive <br />vehicles on the turf, basketball courts, or other landscaped or hardscaped area(s) unless the Parks <br />Division Manager supplies written permission. <br />• At park locations where sidewalk access is permitted, the Contractor must <br />temporarily remove a bollard for access. Upon leaving each park site, the Contractor shall <br />replace all the bollards that were removed. <br />• The Contractor must drive slowly and carefully while performing any associated <br />work in park locations and yield to park users <br />• All vehicles utilized by the Contractor shall have wording which clearly identifies <br />the Contractor <br /> <br />Equipment/Vehicles <br />Standard tree pruning equipment shall always be used and maintained in satisfactory condition <br />and in compliance with State and Federal/OSHA regulations. Equipment unsuitable for <br />producing the required work quality should not be permitted on the job site. All tools shall be <br />clean, sharp, and in proper working order and shall be checked for safety before each job. All <br />trucks, chippers, and other heavy equipment shall be in good operating condition and compliant <br />with all applicable laws and regulations. All vehicles and trucks shall be equipped with a spill <br />kit. All cars, trucks, and equipment shall be serviced off-site. <br /> <br />Docusign Envelope ID: CFBCA4B2-32D3-4B9F-8862-2F2E71D4F416