My WebLink
|
Help
|
About
|
Sign Out
AKEL ENGINEERING GROUP, INC. (#2025578)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
A
>
AKEL ENGINEERING GROUP, INC. (#2025578)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 9:52:01 AM
Creation date
8/12/2025 9:40:13 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
AKEL ENGINEERING GROUP, INC. - FIRST AMENDMENT
Contract Record Series
704-05
Munis Contract #
2025578
Contract Expiration
2/28/2025
NOTES
PROFESSIONAL SERVICES FOR HYDRAULIC ANALYSIS RELATED TO THE EAST PLEASANTON ANNEXATION PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br />East Pleasanton Annexation Hydraulic Analysis Update <br />PROPOSAL <br />SCOPE OF WORK <br />Task No.Task Title Task Description <br />Se <br />n <br />i <br />o <br />r <br /> <br />P <br />r <br />i <br />n <br />c <br />i <br />p <br />a <br />l <br />Pr <br />i <br />n <br />c <br />i <br />p <br />a <br />l <br />As <br />s <br />o <br />c <br />i <br />a <br />t <br />e <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />As <br />s <br />i <br />s <br />t <br />a <br />n <br />t <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />En <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br /> <br />As <br />s <br />i <br />s <br />t <br />a <br />n <br />t <br />GI <br />S <br /> <br />A <br />n <br />a <br />l <br />y <br />s <br />t <br />To <br />t <br />a <br />l <br /> <br />H <br />o <br />u <br />r <br />s <br />Labor Costs Total Cost <br />$289 $261 $193 $165 $131 $142 <br />Task 1 <br />Hydraulic Analysis <br />Update for the East <br />Pleasanton <br />Annexation <br />This task includes the following: <br />1. Update the water demands for each development (Arroyo <br />Lago and East Lakes) based on the new development densities <br />provided by City staff. <br />2. Incorporate updated demands into the hydraulic model <br />3. Perform hydraulic analysis with the updated water demands to <br />determine the pro-rata share cost of the proposed water main. <br />Deliverables: Brief technical memorandum documenting the <br />results of the hydraulic analysis. <br />1 8 6 2 1 4 22 $4,564 $4,564 <br />Total 1 8 6 2 1 4 22 $4,564 $4,564 <br />1/17/2025 <br />Hours Costs <br />FEE ESTIMATE <br />Docusign Envelope ID: 2D332A97-FFF8-41C8-9BD8-7D650725D2C5Docusign Envelope ID: 7E83C83A-80E6-4D7E-9CF5-39FFF436C766
The URL can be used to link to this page
Your browser does not support the video tag.