Laserfiche WebLink
Table 1 Water Demand Estimates <br />East Pleasanton Annexation Hydraulic Analysis <br />City of Pleasanton <br />Development Land Use Type Maximum <br />Day <br />(gpd)(gpm)(gpm) <br />Site H Industrial 263,355 sq.ft.45 gpd/1,000 sq.ft.11,851 8.2 <br />Commercial 12,000 sq.ft.360 gpd/1,000 sq.ft.4,320 3.0 <br />Site H Total 16,171 11.2 21.3 <br />Arroyo Lago SFR 194 units 390 gpd/unit 75,660 52.5 99.8 <br />East Lakes SFR 357 units 390 gpd/unit 139,230 96.7 <br />MFR 212 units 180 gpd/unit 38,160 26.5 <br />Social/Rec/Restaurant 6,000 sq.ft.360 gpd/1,000 sq.ft.2,160 1.5 <br />East Lakes Total 179,550 124.7 236.9 <br />Amazon Property Industrial 830,471 sq.ft.45 gpd/1,000 sq.ft.37,371 26.0 49.3 <br />Total 425,041 214.4 407.4 <br />Notes:12/9/2024 <br />1. Source: 2024 Water Distribution System Capacity Master Plan, Table 3.5 <br />Units Unit Factor1 Average Day <br />Demands <br />189 units <br />Annotations by: <br />Michael Stella, P.E. <br />City of Pleasanton <br />1-16-2025 <br />No change <br />No change <br />100 + 35 + 107 = 242 units <br />355 units <br />100 units <br />Affordable <br />Multi-Family <br />Docusign Envelope ID: 2D332A97-FFF8-41C8-9BD8-7D650725D2C5Docusign Envelope ID: 7E83C83A-80E6-4D7E-9CF5-39FFF436C766