Page 2 of 4 <br />costs much lower than the City’s estimated cost. As an example, Alameda County <br />implemented a quiet zone at the Castlewood Road crossing by installing 200 feet of flexible <br />post delineators (estimated construction cost $40,000). <br /> <br />Several steps must be completed before any improvements are constructed, and a quiet zone <br />may be implemented in Pleasanton (improvements are termed Supplemental Safety <br />Measures—SSMs). The Quiet Zone Feasibility Study and Preliminary Design CIP is intended <br />to complete these preconstruction requirements using an industry expert consultant. <br /> <br />Elements of the Feasibility Study include: <br />• Determination of crossings to be included in the quiet zone <br />• Conducting a diagnostic review with a Diagnostic Review Team (members would <br />include: Federal Rail Authority (FRA), Union Pacific Railroad, Altamont Corridor Express <br />(ACE), and City staff) <br />• Updating the U.S. Department of Transportation (USDOT) Crossing Inventory Form to <br />reflect current physical and operating conditions at each crossing located within a <br />proposed quiet zone <br />• Providing a Notice of Intent (NOI) to all the railroad operators in the proposed quiet <br />zone, the State agency responsible for highway safety, and the State agency <br />responsible for crossing safety (the NOI provides a brief explanation of the tentative <br />plans for implementing the quiet zone improvements) <br />• Determining and documenting the process to establish the quiet zone based on the <br />FRA risk calculator. This includes outlining required improvements, reviewing with and <br />receiving approval from the Diagnostic Review Team. <br /> <br />Elements of Design include: <br />• Designing the SSMs identified in the Feasibility Study <br />• Submitting the designs for approval by the Diagnostic Review Team. <br /> <br />Upon completion of the design, staff will return to the City Council to outline the construction <br />cost associated with establishing the quiet zone, and discuss funding options. <br /> <br />Assuming sufficient resources are available and the City Council authorizes construction to <br />proceed, completion of construction will allow the City to provide a Notice of Quiet Zone <br />Establishment to all parties. The quiet zone would go into effect 21 days after this notice is <br />provided. <br /> <br />Schedule <br />The full timeline is unknown at this time and will be based on the scope of work/schedule from <br />consultants. Reports from neighboring local agencies indicate that the feasibility and design <br />process could take two years or more to complete. Construction timeframes and the effective <br />date of the quiet zone cannot be determined at this time, since the scope of improvements is <br />yet to be determined. <br /> <br /> <br />Page 155 of 674