My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 3:52:54 PM
Creation date
8/12/2025 3:47:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
674
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 4 <br /> <br />EQUITY AND SUSTAINABILITY <br />Investments in multimodal infrastructure that supports a wide range of transportation options <br />improve roadway safety and accessibility while reducing pollution and supporting public health. <br /> <br />OUTREACH <br />No outreach was conducted, as this item is a routine matter of City business. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the ONE Pleasanton strategic goals of Funding Our Future, <br />Strategy 2 - Identify expanded and new revenue sources to address significant infrastructure <br />needs and Investing in Our Environment, Strategy 1 - Implement the four-year CIP to complete <br />design and construction of budgeted capital projects. This action will allow the City to receive <br />significant new grant funding in support of planned capital improvement projects. <br /> <br />FISCAL IMPACT <br />The total estimated cost to design Phase 2 of the West Las Positas Multimodal Reconstruction <br />Project is $1,000,000. Alameda CTC will provide $750,000 (75 percent of the project cost), and <br />the City will match with $250,000 (25 percent local fund match). Funding for the $250,000 local <br />match is budgeted and available through Measure BB pass-through funds already allocated to <br />this CIP project. <br /> <br />The total estimated cost to design the I-580 Overcrossing Bicycle and Pedestrian <br />Improvements is $750,000. Alameda CTC will provide $525,000 (75 percent of the project <br />cost) and the City will match with $175,000 (25 percent local fund match). Funding for the <br />$175,000 local match is budgeted and available through Measure BB pass-through funds <br />already allocated to this CIP project. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />Cedric Novenario, Senior <br />Transportation Engineer <br />Ellen Clark, Director of Community and <br />Economic Development <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Attachments: <br />1. West Las Positas Funding Agreement (A25-0053) <br />2. I-580 Overcrossing Bike/Ped Funding Agreement (A25-0054) <br /> <br />Page 93 of 674
The URL can be used to link to this page
Your browser does not support the video tag.