My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
081925 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 3:52:54 PM
Creation date
8/12/2025 3:47:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/19/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
674
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> <br />The proposed bicycle and pedestrian improvements include relocating existing crosswalks to <br />improve pedestrian and bicyclist visibility, upgrading existing accessible curb ramps, adding <br />rectangular flashing beacons and hybrid beacons (a type of signalized crossing), creating new <br />buffered bike lanes and protected bike lanes, and improving pavement markings. <br /> <br />Caltrans approval is required for any improvements completed on these overcrossings. This <br />approval is achieved through the Permit Engineering Evaluation Report (PEER), which is <br />intended to streamline project processing and is used for projects between $1,000,000 and <br />$3,000,000. <br /> <br />The I-580 Overcrossing Bicycle and Pedestrian Improvements project will complete the design <br />plans and the PEER process to make the construction-ready. <br /> <br />DISCUSSION <br />On May 22, 2025, Alameda CTC approved the 2026 CIP, which includes $60.16 million in new <br />programming from fiscal year (FY) 2025/26 through FY 2029/30. The new programming is <br />comprised of: <br />• $50.29 million in new programming and allocation consisting of funds from Measure B, <br />Measure BB, VRF, and TFCA funds <br />• $9.87 million for other new programming (capital projects from Alameda CTC, Union <br />City and Countywide Transportation Programming) <br /> <br />The City was awarded design funds for the West Las Positas Multimodal Reconstruction <br />Project (Phase 2 - Iron Horse Trail to Santa Rita) and the I-580 Overcrossing Bicycle and <br />Pedestrian Improvements Project. The total design cost, amount awarded, and required local <br />matching are: <br /> <br />West Las Positas Multimodal Reconstruction Project (Phase 2- Iron Horse Trail to Santa Rita <br />Road) - $1,000,000 Design Cost <br />• $750,000 Alameda CTC Award Amount <br />• $250,000 City Local Match (25 percent local match) <br /> <br />I-580 Overcrossing Bicycle and Pedestrian Improvement - $700,000 Design Cost <br />• $525,000 Alameda CTC Award Amount <br />• $175,000 City Local Match (25 percent local match) <br /> <br />Funding Agreement <br />Funding agreements A25-0053, West Las Positas Multimodal Reconstruction (Iron Horse Trail <br />to Santa Rita Road), and A25-0054, I-580 Overcrossing Bicycle and Pedestrian Improvements, <br />outline the roles and responsibilities of the City of Pleasanton and Alameda CTC in completing <br />the design of both projects. Project sponsors are required to provide a 25 percent local match <br />of the project total. <br />Page 92 of 674
The URL can be used to link to this page
Your browser does not support the video tag.