<br />Transportation Safety Action Plan
<br />CITY OF PLEASANTON
<br />LOCAL ROADWAY SAFETY PLAN, LIVERMORE | 2022-2023
<br />Reference: Joanna Liu | City of Livermore | (925) 960-4556| xliu@cityoflivermore.net
<br />TJKM assisted the City of Livermore with comprehensive services to develop a LRSP for
<br />the City’s roadways. Based on our LRSP the TJKM Team assisted the city to apply for
<br />HSIP Cycle 12 call-for-projects. The overarching goal of the LRSP is to reduce KSI traffic
<br />collisions. The LRSP included literature review, safety (collision) analysis, countermeasure
<br />toolbox, viable safety projects, implementation plan, and community outreach. The LRSP
<br />was implemented through a holistic approach incorporating the 5 E’s of traffic safety
<br />(Education, Enforcement, Engineering, Equity, and Emergency Medical Services) that will
<br />enhance safety for all modes of transportation. A successful LRSP identifies viable safety
<br />projects with reasonable cost estimates and phasing and contains a monitoring mechanism to evaluate effectiveness of the plan itself.
<br />CONCORD COLLISION ANALYSIS DASHBOARD AND VISION ZERO ACTION PLAN, CONCORD | 2022-2023
<br />Reference: Abhishek Parikh, City of Concord, (925) 671-3031, abhishek.parikh@cityofconcord.org
<br />TJKM developed a Collision Analysis Dashboard using over 10 years of collision data for various
<br />agencies, including the City of Concord. This Dashboard features an interactive mapping tool that
<br />supports collision analysis, data visualization, trend analysis, and HIN monitoring. These features
<br />enabled Concord to prioritize safety projects with the highest benefits and work towards their
<br />Vision Zero goal.
<br />In addition to the Dashboard, TJKM also developed Concord's Vision Zero Action Plan. The
<br />integration of the Collision Analysis Dashboard with Concord’s ArcGIS asset management
<br />platform has enhanced the city’s ability to monitor safety projects, identify future needs, and secure grant funding. This comprehensive approach
<br />supports Concord in implementing and evaluating safety measures, improving overall road safety, and advancing Vision Zero objectives.
<br />VTA COUNTYWIDE LOCAL ROAD SAFETY PLAN, SANTA CLARA COUNTY | 2021-2023 Reference: Eugene Maeda, Santa Clara Valley Transportation Authority (VTA), (408) 952-4298, Eugene.maeda@vta.org
<br />TJKM assisted VTA in preparing a multi-jurisdictional Countywide Local Roads Safety Plan (CLRSP) for
<br />nine of its 16-member agency jurisdictions. The Plan was a collaborative effort through the Systems
<br />Operations and Management Working Group, comprised of local agency transportation engineers and
<br />planners, and input from the local communities. The CLRSP followed Caltrans’ Strategic Highway Safety
<br />Plan data-driven approach by addressing the 5 E’s of traffic safety. The CLRSP is used as a guidance
<br />document for short and medium-term planning, designing, funding, and implementing safety projects. The
<br />CLRSP also developed a process for tracking the progress of the plan itself, as well as monitoring the effectiveness of the installed projects.
<br />The Safety Plans provided nine jurisdictions with a systematic process for reducing and eventually eliminating fatal and serious injury KSI
<br />collisions on the local roadway network. The process included a framework for engaging communities and stakeholders, analyzing collisions by
<br />causes and severity, equity evaluation for disadvantaged communities utilizing the CalEnviroscreen 4.0 poverty percentile, recommending
<br />countermeasures and safety projects, and prioritizing the implementation of safety measures with schedules. TJKM worked with seven cities
<br />that have already prepared LRSPs and incorporated their findings into the countywide plan to ensure it reflects the needs of all cities within the
<br />County. Based on the submitted applications by the TJKM Team in September 2022, the county secured $3.2M in HSIP Grant funding.
<br />LOCAL ROADWAY SAFETY PLAN, GLENDALE | 2020-2022
<br />Reference: Eugene Maeda, Santa Clara Valley Transportation Authority (VTA), (408) 952-4298, Eugene.maeda@vta.org
<br />TJKM assisted the City of Glendale in developing an LRSP. This living document included
<br />Systemic Safety Approach involving following steps Develop plan goals and objectives; Analyze
<br />collision data; Meet with stakeholders/safety partners; Determine focus areas and identify crash
<br />reduction strategies; Prioritize countermeasures/projects; Safety Action Plan; and Prepare the
<br />LRSP. Involvement of safety partners was critical for the City and played a major role in the success
<br />of the LRSP. For the City of Glendale, this included numerous City departments, as well as other
<br />governmental agencies, community organizations, and Glendale residents. Four virtual
<br />stakeholder meetings were held as part of this project: two were held with City of Glendale staff
<br />and two were held with outside organizations and City staff. The final report was submitted to the
<br />City in July 2022. As part of the project, TJKM prepared and submitted four HSIP applications for Cycle 11 on behalf of the City in
<br />September 2022. Based on the submitted applications the TJKM Team helped the City to secure $6.5M in HSIP Grant funding.