My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
071525 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:12:32 AM
Creation date
8/13/2025 11:08:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 8 <br />Transportation Safety Action Plan <br />CITY OF PLEASANTON <br />We Know Pleasanton <br />Headquartered in Pleasanton, TJKM brings a wealth of local experience. We have been working with the City and developers within the City for <br />the past 50 years. Since our inception in 1974, we have successfully completed more than 500 transportation planning and traffic engineering <br />projects in Pleasanton. TJKM served on the Pleasanton On-Call Transportation Consulting Services Contract and completed three task orders <br />under that agreement including: Hopyard & Owens Intersection Improvements, Traffic Impact Study at 4884 Harrison Street, and Valley Avenue <br />& Paseo Santa Cruz Before-and-After Assessment. With our extensive experience, we are very familiar with the local policies, procedures, and <br />unique needs of the City. Our team’s local presence and expertise makes us well-equipped for this Transportation Safety Action Plan. Below <br />are just some of the many projects we have completed within the City: <br />• Traffic Studies: <br />o 3595 Utah Street <br />o Lester Project/Hidden Canyon CEQA <br />• Traffic Assessments for Residential Developments at: <br />o 5976 and 5994 W. Los Positas Boulevard <br />o 4400 Black Avenue <br />o 3200 Hopyard Road <br />• Dublin Canyon/Canyon Meadows TS-SS <br />• Shell Oil Driveway Analysis <br />• Hacienda Monument Structures Signal Cost Estimates <br />• Traffic Signal Modifications: <br />o Owens at Hopyard <br />o Traffic Design Plans for the Irby Ranch Property <br />o Las Positas at Hacienda <br />o Stoneridge Drive at Pacific Pearls <br />• Lydiksen Elementary School Circulation Review <br />• Bernal at Nevada TS-SS CIP 17532 <br />• Trip Generation for an Event Center, Lodging Facility, and <br />Restaurant at 2001 Ruby Hill Boulevard <br /> <br />Team Roles, Locations, and Responsibilities <br />The proposed Key Personnel on this TJKM Team are the most qualified professionals in their respective areas of specialization. The TJKM <br />Team has been carefully crafted to provide the City of Pleasanton with the full range of expertise needed to and deliver your Transportation <br />Safety Action Plan successfully. Below a table showing the roles, locations, and responsibilities of our team members. We have provided the <br />level of effort with the schedule showing the percent of time each team member will spend on each task. <br />Role Personnel & Location Responsibilities <br /> <br />Principal-In-Charge Nayan Amin, TE <br />Pleasanton <br />Mr. Amin will oversee your project ensuring that our Project Manager adheres to the work <br />plan, schedule, and budget. <br /> <br />Project Manager Ruta Jariwala, PE, TE <br />Pleasanton <br />Ms. Jariwala will be responsible for day-to-day coordination and activities and will be your <br />single point of contact ensuring the Action Plan is delivered on schedule within budget to <br />your satisfaction. <br /> <br />QA/QC Carlo Sendaydiego, TE <br />Pleasanton Mr. Sendaydiego will provide QA/QC on the project. All documents will be reviewed by Mr. <br />Sendaydiego before being submitted to the City of Pleasanton. <br /> Task Lead Mark Doty <br />Pleasanton <br />Mr. Doty will serve as the Task Lead, overseeing and directing team members for the <br />Stakeholder Working Group, Background Documents Review, Bicycle and Pedestrian <br />Plan Connectivity and Programming Identification tasks. He will be responsible for <br />directing team members working on these tasks. <br /> Task Lead Rutvij Patel, EIT <br />Pleasanton Mr. Patel will be the Task Lead for the Countermeasure Identification task and will direct <br />team members working on the task. <br /> Task Lead Pranav Happa, PE <br />Pleasanton Mr. Happa will serve as Task Lead for the Crash Collection and Analysis and Identification <br />of Areas of Concern. He will direct team members working on these tasks. <br /> <br />Task Lead Aayush Kalantri <br />Pleasanton & San Jose Mr. Kalantri will serve as Task Lead for Field Conditions Review. He will direct team <br />members working on this task. <br /> Support Staff Esmaeil Balal, PhD, PE <br />Pleasanton Mr. Balal will support the team with the Stakeholder Working Group, Crash Collection and <br />Analysis, Bicycle and Pedestrian Plan Connectivity, and Programming Identification tasks. <br /> Support Staff Andrew Dickinson <br />Pleasanton & San Jose <br />Mr. Dickinson will work on the Identification of Areas of Concern, Countermeasures <br />Identification, and Implementation Actions tasks supporting Ms. Jariwala, Mr. Patel, and <br />Mr. Happa. <br />PIC <br />PM <br />QA <br />TL <br />TL <br />TL <br />TL <br />SS <br />SS <br />Page 53 of 694
The URL can be used to link to this page
Your browser does not support the video tag.