Laserfiche WebLink
<br />6/02/2025 <br />Existing Conditions Report <br />Castlewood County Service Area (CCSA) <br /> <br />12 <br /> <br />charges). The calculation of charges does not include a contingency for emergencies. No County policies regarding <br />CSA reserves or fund balances were identified. <br />Water M&O Service Charges <br />Service charges based on annual costs provide funding for water maintenance and operations. Total service charges <br />increased significantly in recent years, primarily due to water operations and maintenance as noted above in the <br />section Non-recurring Water M&O Expenditures. <br />Water M&O rates were $1,089 per meter/connection for nine years through FY24,33 increasing to $2,958 in FY25 or <br />nearly triple the prior year. The following year, FY26, charges are projected to increase to $3,940 if the proposed <br />supplemental charge for prior year fund balance deficits (see below) applies to a full year of FY26. The supplement <br />is proceeding through the notice and hearing process.34 <br />A number of factors contributed to water O&M costs exceeding revenues, a need for higher rates, and reductions in <br />fund balances that triggered a County loan and supplemental assessment. Cost factors included: <br />1. Unforeseen leaks and pump failures during fiscal years FY2022-23 and FY2023-24, demanding immediate <br />attention.35 <br />2. Water system configuration and operation information missing , or system improperly configured, contributing <br />to higher emergency repair costs.36 <br />3. Multiple changes in O&M contract providers at increasing contract costs and additional charges.37 <br />4. Water overage charges for usage exceeding CCSA’s allocated 90MG annually due to excess use,38 leakage, and <br />possible impacts during water tank repair and testing.39 <br />Prior years’ rates did not anticipate or incorporate these costs, and did not provide reserves for contingencies and <br />emergencies; consequently, ACWPA added a supplemental charge beginning in FY2025-26 to repay the County <br />loan40 for an accumulated fund balance deficit to that point. <br /> <br />33 Annual Report, Fiscal Year 2023-2024, Table 2. <br />34 FY26 Annual Report, 5/6/2025, recommending rates for FY2025-26. <br />35 Castlewood CSA R-1967-1 Engineer’s Report for Proposed Supplemental Service Charge, April 22, 2025, pg. 5-6. <br />36 Review of Five Years of Water Maintenance Invoices, CPOA Water Committee 3/20/2025. <br />37 Castlewood CSA R-1967-1 Engineer’s Report for Proposed Supplemental Service Charge, April 22, 2025, pg. 5-6. <br />38 CCSA subsequently implemented charges for excess use by residents [date]. <br />39 Review of Five Years of Water Maintenance Invoices, CPOA Water Committee 3/20/2025. <br />40 See ACPWA memorandum to BOS with attached resolution R -2024-484, Oct. 2, 2024.