My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MEMORANDUM <br /> <br />Date: February 14, 2025 <br /> <br />To: Mayor and City Council <br /> <br />From: Gerry Beaudin, City Manager <br />Mike Tassano, Deputy Director of Community Development, <br /> Transportation <br /> <br />Subject: February 18, 2025, City Council Meeting, Agenda Item 9: Update <br />on Residential Development Proposals on Two Properties in East <br />Pleasanton - El Charro Extension Study <br /> <br /> <br />This memorandum transmits the attached El Charro Extension Study, which provides <br />an evaluation of East Pleasanton development on future traffic conditions, focused <br />particularly on the extension of El Charro Road south from Stoneridge Drive to either <br />Busch Avenue or Stanley Boulevard. <br /> <br />With the potential advancement of development projects in East Pleasanton, the City <br />requested Fehr and Peers Transportation Consultants prepare the attached traffic study <br />to evaluate the effects of future development in East Pleasanton and the need, timing <br />and design for the extension of El Charro Road. <br /> <br />El Charro Road is included in the General Plan, which envisioned the extension to be <br />constructed between 2011 and 2015 (as part of the East Pleasanton Specific Plan <br />construction). The City’s traffic model assumes the El Charro extension is in place at <br />buildout.1 <br /> <br />The goal of the traffic study is to 1) determine the need for El Charro Road extension. 2) <br />Determine when, based on development construction, the extension is needed. 3) <br />Determine if a two-lane or four-lane El Charro Road is needed and 4) Determine if only <br />a partial construction of El Charro Road (North section only from Stoneridge Drive to <br />Busch Road) is sufficient, versus extension south to Stanley Boulevard. <br /> <br /> <br />1 “Buildout” is the planning term used to describe the hypothetical point at which the assumed feasible <br />amount of development contemplated in the General Plan has been built, and with it all components of <br />the General Plan’s presumed future roadway network.
The URL can be used to link to this page
Your browser does not support the video tag.