My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Tassano January 31, 2025 <br />Page 37 of 37 <br />developments on the average intersection delay is about double the other two land use <br />developments (Arroyo Lago and Amazon). <br />The analysis of the effects of a partial extension of El Charro Road between Stoneridge Drive and <br />Busch Road yields smaller benefits than a full extension, resulting in about half of the average <br />delay reduction. Under this scenario, no new intersections would operate at unacceptable <br />conditions, but the extension would increase traffic along Busch Road, making traffic operations <br />along that segment approach unacceptable levels of service. <br />Finally, an extension of El Charro Road as a two-lane roadway would also result in about half of <br />the average delay reduction compared to the four-lane extension, with intersections such as El <br />Charro Road at Stanley Boulevard and El Charro Road at Stoneridge Boulevard reaching <br />unacceptable LOS conditions and resulting in major travel time delays along El Charro Road <br />compared to the four-lane roadway scenarios. <br />Findings <br />The main findings of this assessment are as follows: <br />• Is the El Charro Road Extension needed? – The analysis finds that the extension of El <br />Charro Road offers significant benefits to parallel infrastructure facilities, particularly <br />Santa Rita Road, and is needed to support future development in east Pleasanton. <br />• When is the El Charro Road Extension needed? – The study’s sensitivity analysis <br />suggests the extension is desirable in the near-term with the development of all <br />approved projects and the planned Kiewit development. Violations of the city’s LOS <br />policies at critical intersections, including Valley Avenue and Santa Rita Road, would occur <br />without the extension. <br />• Should the El Charro Road Extension have its southern terminus at Busch Road or <br />Stanley Boulevard? – It is recommended that the facility’s southern terminus occur at <br />Stanley Boulevard. Terminating the facility at Busch Road would provide substantially <br />fewer transportation benefits. <br />• Should the El Charro Road Extension be a four-lane or two-lane roadway? – The <br />study’s travel demand forecasts show that the extension should be implemented as a <br />four-lane facility. A two-lane roadway would result in additional violations of the city’s <br />LOS policies, serve lower volumes of traffic, and provide smaller transportation benefits. <br />Attachments <br />Appendix A LOS Calculations for Circulation Analysis <br />Appendix B LOS Calculations for Sensitivity Assessment
The URL can be used to link to this page
Your browser does not support the video tag.