My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIALS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
021825 REGULAR
>
SUPPLEMENTAL MATERIALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 12:05:26 PM
Creation date
8/13/2025 12:01:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Tassano January 31, 2025 <br />Page 36 of 37 <br />Table 16: El Charro Road Traffic Volumes Summary <br />Segment Peak <br />Hour <br />Alternative 4 <br />(Four-Lane <br />Extension <br />Alternative 5 <br />(Partial <br />Extension) <br />Diverted <br />Traffic <br />Alternative 6 <br />(Two-Lane <br />Extension <br />Diverted <br />Traffic <br />El Charro Road NB AM PM <br />1,400 750 -650 1,000 -400 <br />1,000 650 -350 650 -350 <br />El Charro Road SB AM PM <br />650 450 -200 600 -50 <br />1,350 800 -550 1,000 -350 <br />Source: Fehr & Peers, January 2025. <br />Conclusions <br />The results of this transportation assessment indicate that the transportation effects of the <br />proposed El Charro Road extension in terms of traffic volume (diversion), intersection LOS at key <br />locations, and travel times on key links are generally positive, as the project benefits other <br />competing north-south roadways, such as Santa Rita Road, by re-routing traffic from them. These <br />beneficial effects are consistent regardless of the direction or peak hour of travel. The project has <br />similar positive circulation effects on Valley Avenue and Stoneridge Drive. <br />The extension has a positive or neutral effect on most segments, intersections, and key routes <br />studied, although there are some roadways which may experience increased traffic with the <br />proposed extension. The main roadways affected by the project are Bernal Avenue and Stanley <br />Boulevard, which serve as feeder roads to the extension. For this reason, plus the added traffic on <br />El Charro Road, the intersection of El Charro Road at Stoneridge Drive is anticipated to increase its <br />average delay with the extension. Nevertheless, this intersection is expected to operate at LOS D <br />or better. <br />The El Charro Road volume increase cannot be solely explained by decreases on competing <br />routes. This as well as the existing travel patterns assessment presented in this memorandum <br />suggests there is some level of cut-through traffic from I-680 and I-580 as well as induced <br />regional demand that would use the new roadway extension. Approximately 10% to 15% of traffic <br />volume on the extension would be regional cut-through traffic without a local origin or <br />destination. This represents about 150 to 200 vehicles in the peak direction, less cut-through <br />traffic than what is currently observed on Santa Rita Road (200 to 350 vehicles). Approximately <br />50% of the cut-through traffic on El Charro Road would come from existing cut-through traffic on <br />Santa Rita Road. <br />The results suggest that of the four land use development projects proposed in the study area <br />that are currently under consideration by the city, the developments with the largest potential <br />impact on the study intersections are Kiewit and Senior Residential. The impact of these
The URL can be used to link to this page
Your browser does not support the video tag.