Laserfiche WebLink
Traffic Signal Maintenance Contract Contract No.______ <br />Scope of Work Page 3 <br /> <br /> <br />The contractor shall itemize each repair made as part of routine maintenance and recommend to the <br />City additional work that may be needed and not covered in the Routine Maintenance Program. <br /> <br />2.1 Routine Maintenance <br />The Contractor shall perform a comprehensive signal maintenance program designed to eliminate or <br />reduce traffic signal malfunctions, reduce signal operation complaints, and extend the useful life of <br />the traffic signal equipment. This program shall include, but not be restricted to, Section 12 – <br />Preventative Maintenance Schedule. <br /> <br />2.2 Traffic Signal Control Equipment <br />The Contractor shall repair or replace all defective parts of the traffic signal control equipment with <br />like make and model parts for temporary and permanent replacements, except as individually agreed <br />upon by City Traffic Engineering Division. <br /> <br />No permanent change of control mechanisms shall be made without prior approval of the City. <br />Whenever equipment is removed from the controller cabinet, the City Traffic Engineering Division <br />shall be notified by phone within 24 working hours. <br /> <br />Contractor agrees to notify the City Traffic Engineering Division in advance of any traffic signal <br />turn-offs or turn-ons necessitated by Contractor's operations. Contractor shall not make said turn-off <br />or turn-on without the approval of City Traffic Engineering Division. <br /> <br />All traffic signal controller equipment shall be maintained as recommended by the manufacturer. <br /> <br />The Contractor shall bear the full cost of repairing or replacing traffic signal components under the <br />provisions of the routine maintenance program. When traffic signal components become obsolete or <br />deteriorated to the point of being beyond repair, Contractor shall report such conditions to the City <br />Traffic Engineering Division and provide satisfactory evidence that replacement is necessary. <br />Contractor shall prepare an estimate showing the cost breakdown of material and labor for <br />replacement of such equipment, and submit this information to the City Traffic Engineering <br />Division. <br /> <br />2.3 Spare Equipment <br />The Contractor shall maintain adequate storage and shop repair facilities to perform the requirements <br />of this Agreement, including a sufficient stock of spare parts, standby controllers and signal <br />equipment to complete permanent repairs to the system within a thirty (30) day period. Failure to <br />complete permanent repairs within this time limit may be sufficient cause for the City to authorize <br />repairs to be completed by others. Repetitive failure shall be sufficient cause for the City to <br />terminate this Agreement. <br /> <br />The Contractor shall be responsible for furnishing all spare standby controllers necessary to maintain <br />the continued safe, efficient operation of the signal system when the original unit is withdrawn for <br />maintenance, repair or modification. Standby controllers shall be fully compatible with the City’s <br />Docusign Envelope ID: 3B82A602-152E-44CD-836A-6603E8712601