Laserfiche WebLink
Traffic Signal Maintenance Contract Contract No.______ <br />Scope of Work Page 4 <br />traffic control system without exception. All component parts (detectors, load switches, phones, <br />lights, signal monitors, etc.) of each system shall be maintained at all times to perform the functions <br />for which they were designed unless authorized to the contrary by the City Traffic Engineering <br />Division. <br />2.4 Vehicle Signals <br />All new installed lamps SHALL BE LED and meet the most current Caltrans Standard <br />Specifications and City of Pleasanton Specifications for vehicle signal faces and signal heads. The <br />Contractor shall replace or repair vehicle signals as they malfunction. All labor resulting from <br />replacing burned out, flickering, dim or otherwise non-functioning vehicle signal indications shall be <br />replaced as part of the preventative maintenance flat rate. <br />2.5 New Traffic Signal Installations <br />Contractor shall maintain any additional traffic signals and appurtenant devices as they are installed, <br />or become a part of the maintenance requirements of the City. Refer to Section 8 of this document <br />for Compensation. <br />Prior to the turn-on of a new traffic signal or a traffic signal modification, Contractor shall perform <br />an inspection of the traffic signal, monitor the flashing-out of the new signal heads, and review the <br />new traffic control equipment operation prior to full activation of the new traffic signal system. <br />Compensation will be per Section 8 of this document as Extra Work. <br />2.6 Pedestrian Signals <br />All new installed pedestrian signals SHALL BE LED COUNTDOWN FULL SYMBOL and meet <br />the most current Caltrans Standard Specifications and the City of Pleasanton Specifications for <br />pedestrian signals. The Contractor shall replace or repair pedestrian signals as they malfunction. All <br />labor costs resulting from replacing burned out, flickering, dim or otherwise non-functioning <br />pedestrian signal indications shall be replaced as part of the preventative maintenance flat rate. <br />2.7 Warranty Service <br />During the period of warranty, the Contractor is expected to make all communications between <br />manufacturer, installing contractor and the City Traffic Engineering Division regarding any warranty <br />service. Contractor shall notify the City Traffic Engineering Division of any undue delays in <br />response by the manufacturer or installing Contractor and details of each incident. <br />2.8 Electronic Record System <br />The contractor shall supply and make operational a Windows-based computerized maintenance and <br />inventory management system accessible by the City and Contractor via the Internet that at a <br />minimum shall provide the following features: <br />Intersections – A complete database of signalized intersections including all routine <br />maintenance histories, complete equipment inventory, electronic photo images, <br />repair history and installation date of all equipment utilized at each location. <br />Docusign Envelope ID: 3B82A602-152E-44CD-836A-6603E8712601