My WebLink
|
Help
|
About
|
Sign Out
ST. FRANCIS ELECTRIC (#2025586)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
S
>
ST. FRANCIS ELECTRIC (#2025586)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 4:08:49 PM
Creation date
8/18/2025 4:05:19 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
ST. FRANCIS ELECTRIC, LLC
Contract Record Series
704-05
Munis Contract #
2025586
Contract Expiration
6/30/2027
NOTES
CONTRACTOR PROVIDING TRAFFIC SIGNAL MAINTENANCE SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Signal Maintenance Contract Contract No.______ <br />Scope of Work Page 18 <br /> <br />proper setting <br />2. Signal Controller <br />• Visually inspect signal controller and controller cabinet components for proper operation <br />and make repairs/replacements as necessary <br />• Check timing of individual signal phases. Contractor shall notify engineer immediately of <br />any operational issues (i.e. skipped or omitted phases). The contractor shall not make any <br />timing changes unless it is a matter of public safety or is needed for the proper operation of <br />the traffic signal. <br />3. Signal & Pedestrian Heads <br />• Visually inspect all vehicular and pedestrian signals for proper operation and replace <br />outages. Replace all burnt out or flickering indications with LED indications <br />• Walk intersection and visually inspect all signal heads including backplates, visors and <br />indications for proper operation and alignment. Replace all broken parts, align signal heads <br />and adjust all mast arm signs as necessary <br />• Check that all pedestrian signals are in good condition, aimed properly and make <br />adjustments as necessary <br />4. Pedestrian Push Buttons <br />• Actuate each button for proper operation. Visually inspect and note condition. Replace or <br />repair any broken or defective pedestrian push buttons. All new pedestrian push buttons <br />shall be two inch ADA push buttons <br />• Check all audible and tactile pedestrian signal are in good condition and properly <br />positioned (where applicable) and make repairs as needed <br />5. Battery Backup Systems <br />• Test battery backup system <br />• Test battery charge and replace as needed <br />6. Interconnect Communication <br />• Check operation <br />• Visually inspect cables, antenna, and other hardware and make repairs as needed <br />7. Miscellaneous <br />• Visually inspect other signal hardware <br />• Correct and/or report all deficiencies <br />• Check operation of flashing beacons at signalized intersections to ensure proper operation <br />• Clean video detection camera lenses as needed <br /> <br />In addition to the monthly maintenance report, the Contractor shall conduct Quarterly Preventative <br />Maintenance and submit a report that shall include all of the following elements. Quarterly <br />maintenance shall take place in the months of July, October, January and April: <br /> <br />Docusign Envelope ID: 3B82A602-152E-44CD-836A-6603E8712601
The URL can be used to link to this page
Your browser does not support the video tag.