My WebLink
|
Help
|
About
|
Sign Out
ST. FRANCIS ELECTRIC (#2025586)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
S
>
ST. FRANCIS ELECTRIC (#2025586)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 4:08:49 PM
Creation date
8/18/2025 4:05:19 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
ST. FRANCIS ELECTRIC, LLC
Contract Record Series
704-05
Munis Contract #
2025586
Contract Expiration
6/30/2027
NOTES
CONTRACTOR PROVIDING TRAFFIC SIGNAL MAINTENANCE SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />responsible for the maintenance of 29 signals (approximately $3,300 per month for ongoing <br />regular maintenance, plus additional variable costs related to preventative maintenance and <br />emergency repairs for the 29 signals), and Caltrans is responsible for half of the cost for <br />intersection signals at freeway ramps (approximately $700 per month in ongoing regular <br />maintenance costs, plus additional variable costs related to preventative maintenance and <br />emergency repairs). <br />The Traffic Signal Repair and Replacement fund is used to replace larger components (traffic <br />signal cabinets, service cabinets, traffic signal cameras, etc.) that have reached the end of <br />their useful life. The Traffic Signal Repair and Replacement budget is $450,000 per year <br />comprised of $100,000 in 52030410-430107 for labor costs and $350,000 in 52030410- <br />440104 for equipment costs). <br />The costs for pole knockdowns are typically recovered from the party that caused the damage, <br />and in the event no recoverable party is identified, the Traffic Engineering operating budget is <br />used to pay for the repair. The annual not-to-exceed amount of $1,000,000 is in place to <br />ensure that sufficient capacity in the contract is available to address any emergency needs. In <br />addition, the signal maintenance services agreement is also utilized to assist in the City's <br />resurfacing contracts (roadway resurfacing removes and replaces the traffic signal detection <br />loops and a signal contractor is required for the repair and replacement of the signal detection <br />system). As noted, $725,000 is budgeted annually in the Traffic Engineering and replacement <br />plan budgets for these costs; if there are costs in excess of this amount due to pole <br />knockdowns (which has happened extremely rarely), or from additional work from a Capital <br />Improvement Project, it will be reflected as mid-year or midterm budget adjustments or through <br />a CIP report to the City Council. <br />Prepared by: Submitted by: Approved by: <br />Cedric Novenario, Senior <br />Transportation Engineer <br />Ellen Clark, Director of Community <br />Development <br />Gerry Beaudin, City <br />Manager <br />Attachments: <br />1. Summary of Proposals <br />2. Maintenance Services Agreement <br />Page 84 of 682 <br />Docusign Envelope ID: 3B82A602-152E-44CD-836A-6603E8712601
The URL can be used to link to this page
Your browser does not support the video tag.