My WebLink
|
Help
|
About
|
Sign Out
LARRY WALKER ASSOCIATES, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
LARRY WALKER ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 2:49:08 PM
Creation date
9/3/2025 2:42:35 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
LARRY WALKER ASSOCIATES, INC.
Contract Record Series
704-05
Munis Contract #
2026131
Contract Expiration
12/31/2026
NOTES
SEWER PIPE BLOCKAGE CONTROL PROGRAM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br />June 3, 2025 <br /> <br />Rita Di Candia <br />Environmental Services Manager, Public Works Department <br />City of Pleasanton <br />P.O. Box 520 <br />Pleasanton, California 94566 <br /> <br /> <br />Subject: Proposal for 2025 SPBCP Services <br /> <br /> <br />Dear Ms. Di Candia: <br /> <br />EEC Environmental (EEC) is pleased to submit this proposal to provide the City of Pleasanton with services <br />in support of the Sewer Pipe Blockage Control Program (SPBCP). Based on our firm’s extensive experience <br />providing Waste Discharge Requirements (WDR)/FOG control program support services throughout the <br />state, including Program Development, food facility inspections, Sewer System Management Plan (SSMP) <br />audits, and SSMP updates, EEC is uniquely qualified to assist the City with the key tasks associated with <br />implementation of the SPBCP. <br /> <br />Pursuant to the scope of work detailed in the City’s Proposal Request for Sewer Pipe Blockage Control <br />Program (SPBCP) Related Services, provided to EEC on 5/15/2025, below is the completed Rate Sheet for <br />the requested services. <br /> <br />RATE SHEET <br /> <br />Task Unit Cost ($) <br />Task 1 - Final Sewer Pipe Blockage Control Program (Note 1) 30-40 Hours $9,200 <br />Task 2: SPBCP Inspections <br />Task 2.1 - Routine SPBCP FSE Inspections (53 locations; Note 2) $375 $19,875 <br />Task 2.2 - Follow-up Compliance Inspections (~25 locations; Note 3) $775 $19,375 <br />Total (Task 1 and 2) $39,250 <br />Task 3: As-Needed Services <br />Task 3.1 - As-Needed SPBCP Routine Inspections (Note 2, 4) $375 <br />Task 3.2 - As-Needed SPBCP Inspections (Limited FSE; Note 2, 5) $300 <br />Task 3.3 - As-Needed Follow-up Compliance Inspections (Note 3, 6) $775 <br />Misc. Assistance for unforeseen services requested (Note 7) Hourly <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 183BA217-2E64-4627-AB5B-FA1828041D5A
The URL can be used to link to this page
Your browser does not support the video tag.