My WebLink
|
Help
|
About
|
Sign Out
LARRY WALKER ASSOCIATES, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
LARRY WALKER ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 2:49:08 PM
Creation date
9/3/2025 2:42:35 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
LARRY WALKER ASSOCIATES, INC.
Contract Record Series
704-05
Munis Contract #
2026131
Contract Expiration
12/31/2026
NOTES
SEWER PIPE BLOCKAGE CONTROL PROGRAM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rita Di Candia <br /> <br />Proposal for SPBCP Support Services 2 June 3, 2025 <br />City of Pleasanton, California <br /> <br />Rate Sheet Notes: <br /> <br />1. SPBCP Plan Update Scope (Task 1): <br />• Evaluate City's current FOG program documentation and code for compliance with Statewide <br />WDR WG-2022-0103-DWQ. <br />• Gather comments/concerns from City personnel to facilitate completion of SPBCP Plan <br />Update. <br />• Provide Draft Update for City review. <br /> <br />Task 1 Assumptions: <br />• Up to 40 hours of PM level personnel (per EEC's current Fee Schedule, 2025 attached) to be <br />provided. If additional hours are required or requested, additional fees will be incurred. <br /> <br />2. SPBCP Plan Update Scope (Task 2.1): <br />• Internal kitchen visual review, documenting cooking equipment and grease control <br />equipment inventory. <br />• FSE pumping record review <br />• Collect and document facility applicable information (per inspection form) <br />• Review of kitchen best management practices (BMPs) <br />• Assess maintenance condition of grease control devices/assess compliance with 25% <br />rule(equipment necessary to conduct sampling work, including DipStick Pro to be provided by <br />EEC). <br />• Provide FSE staff with guidance and educational materials (educational material to be <br />provided by City) <br />• A copy of the inspection form indicating any deficiencies will be provided to the FSE at the <br />end of the inspection. <br />• Provide inspection report summary with photos to City Environmental Services Division (ESD) <br />staff. <br /> <br />Task 2.1 Assumptions: <br />• Inspection unit fee is inclusive of all expenses (equipment, materials, travel, etc.). <br />• Pre-inspection notification (e.g., phone call/email) to each FSE, to be provided by the City. <br />• Notification letter/inspector credentials to facilitate facility entry for inspection to be <br />provided by the City. <br />• Assumes that 50-55 inspections will be assigned; If assigned inspections are less than 50 or <br />more than 55, additional fees will be incurred. <br /> <br />3. SPBCP Compliance Inspection Scope (Task 2.2): <br />• Draft a Notice to Correct for unresolved violations utilizing the template language provide by <br />the City. The contractor shall send City’s Environmental Services Division via email the drafted <br />“Notice to Correct” which City staff will send to FSE. <br />• Follow-up SPBCP compliance inspection following the letter stated compliance due date. <br />• Photo documentation of violation resolution and/or remaining open violations. <br />• Provide ESD staff with Follow-up inspection summary. <br /> <br /> <br /> <br />Docusign Envelope ID: 183BA217-2E64-4627-AB5B-FA1828041D5A
The URL can be used to link to this page
Your browser does not support the video tag.