My WebLink
|
Help
|
About
|
Sign Out
RES 2025037-1
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025037-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:25:33 AM
Creation date
10/3/2025 11:23:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO 2025-037-1
Document Relationships
BAY AREA RAPID TRANSIT (BART) MOU 25-0725
(Message)
Path:
\CITY CLERK\CONTRACTS\B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5: Engagement and option refinement <br /> A. Prepare Outreach Materials: Prepare project outreach materials including handouts, <br /> powerpoint presentations with plans, diagrams and images, and optional materials such. <br /> but not limited to posters, handouts, surveys, and web materials, introducing the options <br /> for site-reuse and the draft goals and objectives developed in Task 4. Inputs from the <br /> community will be used in developing a development framework package including final <br /> goals and objectives, and site re-use vision and standards. <br /> B. Stakeholder Engagement: Present outreach materials at up to five meetings identified in <br /> the stakeholder engagement strategy established in Task 1. This may include traditional <br /> community meetings or"pop-up" events, council study sessions, and/or Technical <br /> meetings with City Departments or Stakeholder. The consultant's participation in these <br /> events will focus on introducing and receiving feedback on site options, as well as draft <br /> goals and objectives. <br /> If deemed preferable, in the stakeholder engagement strategy, one or more of these <br /> meetings may take place prior to the development of the Draft Goals and Objectives and <br /> Draft Reuse Options in Task 4 to inform these drafts. This could be up to 2-3 community <br /> meetings; VMWP to facilitate 1-2 stakeholder sessions organized by the City and BART. <br /> Deliverables: <br /> 5.1 Public Outreach Material as needed. <br /> 5.2 Participation in up to 3 Community meetings; Organize/Run 2 Zoom meetings and or <br /> organize community I in person meetings.And participation in two stakeholder meetings <br /> or individual conversations (See Task 1.D) <br /> Task 6: Development Framework and Implementation Strategies <br /> A. Development Framework Package: Based upon feedback received on the Draft Reuse <br /> Options and Draft Goals and Objectives, produce a Development Framework for the site <br /> that establishes: <br /> a. Goals and Objectives: Based on the feedback received from community and <br /> stakeholder engagement in Task 5, revise Draft Goals and Objectives as needed. <br /> b. Vision and Standards: Using feedback from the community and other <br /> stakeholders. define a comprehensive vision for the site's re-use, outlining both <br /> minimum and preferred development standards and project characteristics that <br /> will likely be included in the RFQ for the site. The minimum standards will <br /> encompass the City's and BART's requirements (e.g., housing requirement as per <br /> City housing element, station access requirements), while the preferred <br /> characteristics will cover the desired land use mix, preferred site designs, and <br /> circulation framework and development parcels. The vision and standards will be <br /> presented in both visual formats, such as concept plans and reference images, as <br /> well as in written form. <br /> c. Implementation actions: Memo identifying necessary agreements. actions, and <br /> studies required to be undertaken to advance the site towards an RFQ for <br /> Page 20 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.