Laserfiche WebLink
E. Opportunities and Constraints Mapping: Working alongside BART and other key <br /> stakeholders, develop an initial assessment of site opportunities and constraints based on <br /> existing conditions and constrains evaluation and background information. This <br /> document will outline the site's potential, showcasing both development opportunities <br /> and challenges. It will serve as a tool to introduce the site to the community, emphasizing <br /> the anticipated benefits for the local area and presenting high-level possibilities for future <br /> development. The materials produced in this task may be utilized by City staff for initial <br /> stakeholder or elected official engagement. <br /> Deliverables: <br /> 3.1 Existing Physical Site Conditions Opportunities and Constraints Evaluation (Draft) <br /> a. Title Reports (provided by BART or the City) <br /> b. Flood Zone Review* <br /> c. Existing Utilities Map* <br /> d. Basis of Design Criteria memo (provided by BART) <br /> *Unless determined unnecessary based on existing analysis identified in Task 1. <br /> 3.2 Existing Physical Site Conditions Opportunities and Constraints Evaluation (Final) <br /> 3.3 Consolidated Stakeholder Notes <br /> 3.4 Prelim. Market Assessment Results Meeting <br /> 3.5 Station Access and Parking Management Study <br /> 3.6 Opportunities and Constraints Mapping <br /> Task 4: Site Reuse Options+ Draft Goals and Objectives <br /> A. Draft Re-Use Options: Draft 2-3 options for site reuse identifying conceptual blocks, a <br /> circulation framework, public and private open spaces, BART station access, vehicular <br /> and bicycle parking and associated multi-modal transportation improvements. The <br /> options will also define a generalized development program that includes a range of land <br /> uses including residential development and complementary non-residential uses, <br /> informed by existing BART and City requirements and by the market study. <br /> B. Final Options Memorandum: Memorandum intended for community and elected official <br /> engagement highlighting site reuse options, visually depicting reuse concepts through <br /> photographs, case studies. and diagrams. <br /> C. Draft Goals and Objectives: Facilitate a collaborative process between the City and <br /> BART to establish a draft set of Goals and Objectives for the site, focusing on community <br /> input, station access, potential land use mix, livability, and environmental sustainability. <br /> A draft produced by the consultant will be finalized by the City and BART for approval <br /> as part of Task 6, and will be integrated into MOU#2 (Task 6F). <br /> Deliverables: <br /> 4.1 Draft and Final Site Re-Use Options Memorandum <br /> 4.2 Draft Goals and Objectives Summary Paper <br /> Page 19 of 21 <br />