My WebLink
|
Help
|
About
|
Sign Out
RES 2025037-1
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025037-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:25:33 AM
Creation date
10/3/2025 11:23:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO 2025-037-1
Document Relationships
BAY AREA RAPID TRANSIT (BART) MOU 25-0725
(Message)
Path:
\CITY CLERK\CONTRACTS\B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> TRANSIT-ORIENTED DEVELOPMENT PLANNING <br /> MEMORANDUM OF UNDERSTANDING <br /> This Memorandum of Understanding ("MOU") is entered into this 15th day of July 2025, by and <br /> between the City of Pleasanton (`City") and the San Francisco Bay Area Rapid Transit District <br /> ("BART" or the `'District") (together, the "Parties") to cooperatively plan for potential <br /> development at and around the Pleasanton side of the Dublin/Pleasanton BART Station <br /> (`'Station"). <br /> RECITALS <br /> A. BART and the City acknowledge that the San Francisco Bay Area region faces a shortage of <br /> homes and a climate crisis that requires a significant reduction in vehicle miles traveled, both <br /> of which are challenges that may be alleviated by transit-oriented development("TOD"). <br /> B. The BART-owned parking lots at and around the Pleasanton side of the Dublin/Pleasanton <br /> Station (the"Site"), attached hereto as Exhibit 1,offer a unique opportunity for TOD because <br /> of their desirable location and adjacency to the Station, the Hacienda Business Park, Iron <br /> Horse Trail (IHT), and Interstate 580. <br /> C. In 2011,the City drafted land use concepts, development standards and guidelines for the site, <br /> but since that time,market conditions, state law(including the passage by the State Legislature <br /> of AB 2923), and site conditions have significantly changed, leading to a need to update and <br /> re-examine the prior work. <br /> D. In 2016, the BART Board adopted three policies which set overall goals for BART's TOD <br /> program: <br /> 1. A TOD Policy, attached hereto (as amended in 2020) as Exhibit 2„ which, sets the goals <br /> of creating complete communities, advancing sustainable communities, increasing <br /> ridership, capturing the value of transit, enhancing transportation choice, and increasing <br /> affordability with target of 35%of all units to be as affordable with a priority of for low- <br /> and very-low-income households, <br /> 2. An Affordable Housing Policy, attached hereto as Exhibit 3, which requires a 20% <br /> affordable housing minimum for each project,and favors those with the greatest depth and <br /> quantity of affordable housing, and <br /> 3. A Station Access Policy, attached hereto as Exhibit 4, to guide access practices and <br /> investments. This Policy aims to support the broader livability goals of the Bay Area, <br /> reinforce sustainable communities, increase the share of BART passengers walking and <br /> biking to the stations, and enable riders to get to and from stations safely, comfortably, <br /> affordably, and cost-effectively. <br /> E. In 2017, the Tri-Valley—San Joaquin Valley Regional Rail Authority was formed and began <br /> planning passenger rail service. known as Valley Link,to potentially connect with the Station <br /> 42562.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.