My WebLink
|
Help
|
About
|
Sign Out
RES 2025037-1
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025037-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:25:33 AM
Creation date
10/3/2025 11:23:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO 2025-037-1
Document Relationships
BAY AREA RAPID TRANSIT (BART) MOU 25-0725
(Message)
Path:
\CITY CLERK\CONTRACTS\B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
via a terminus located in Pleasanton immediately south of Interstate 580, between the Station <br /> and BART's parking lots. <br /> F. In 2012 and 2015 respectively, the City's 4th and 5th Cycle Housing Element designated the <br /> Site for a minimum of 249 units at a minimum density of 30 dwelling units per acre, and in <br /> 2023, in the 6th Cycle Housing Element', that number was revised and increased to a <br /> minimum of 555 units at a minimum density of 75 dwelling units per acre. The 2023 Housing <br /> Element also called for the City to: <br /> 1. Develop and adopt objective design standards for the Site by March 2023, which was <br /> completed, <br /> 2. Work with BART to complete a concept plan for the Site with input from the community <br /> by December 2026, <br /> 3. Ensure that the plan adequately addresses parking for both existing commuters and new <br /> uses while aiming to implement strategies to reduce and manage overall parking demand, <br /> and <br /> 4. Work with BART to actively pursue development interest in the Site, including soliciting <br /> developer input on the plan during plan preparation, with the aim of BART issuing a <br /> Request for Proposal(s) by 2028 or 2029 to pursue development of the site during the 6th <br /> Cycle Housing Element planning period. <br /> G. In 2019, key development standards were incorporated into the Hacienda Design Guidelines <br /> and Standards for other high density housing sites in the vicinity, some of which have since <br /> been developed. <br /> H. In 2024, the Metropolitan Transportation Commission ("MTC") awarded the City a Priority <br /> Sites Technical Assistance grant in the amount of$250,000 to perform work related to the <br /> Site.The City and BART jointly developed the scope of consulting services to be <br /> performed under this grant("Priority Sites Scope of Work"), attached hereto as Exhibit 5. <br /> 1. In 2025, MTC awarded the City two Transit-Oriented Communities grants to perform work <br /> related to the Site ("TOC Scope of Work"): a Parking Management grant in the amount of <br /> $150,000 and a Station Access and Circulation grant in the amount of$150,000. <br /> J. In 2026, BART plans to implement improvements to the IHT through the Station area to better <br /> connect the IHT to BART from both sides ofthe station as well as to other trails and bikeways, <br /> and homes and businesses along the trail. The project aims to: <br /> 1. Close the gap in the IHT so that BART riders can use it for recreation and access the <br /> broader network of trails and green spaces in the area, <br /> 2. Advance BART's 2016 BART Station Access Policy goals (safer, healthier, greener) and <br /> mode share targets (52% active access), and <br /> 3. Separate pedestrian and bicyclist traffic to improve safety and comfort. <br /> Available at https:i/www.cityofpleasantonca.gov,-assets/our-government/housing/policies/general-plan-housing- <br /> element.pdf <br /> 42562.I <br /> page 2 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.