My WebLink
|
Help
|
About
|
Sign Out
BAY AREA RAPID TRANSIT (BART) MOU 25-0725
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
B
>
BAY AREA RAPID TRANSIT (BART) MOU 25-0725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:36:57 AM
Creation date
10/3/2025 11:33:51 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT "BART"
Contract Record Series
704-05
Contract Expiration
10/2/2025
Document Relationships
RES 2025037-1
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br />BART Station Concept Plan <br />(Pleasanton side of Dublin-Pleasanton BART Station) <br />03/20/25 <br />Background <br />The City of Pleasanton (City), in concert with Bay Area Rapid Transit (BART), is seeking to <br />create a transit-oriented development (TOD) concept and key planning guidance for BART <br />parcels on the Pleasanton side of the Dublin-Pleasanton BART Station, that includes housing at <br />the densities assigned in the City’s 6th Cycle Housing and potentially complementary non- <br />residential uses. The tasks outlined in this Scope of Work will result in agreements between the <br />City and BART capturing the next steps required to release an RFP consistent with a shared <br />vision and set of goals and objectives. <br />The City drafted land use concepts, development standards and guidelines for the site in 2011, <br />but since that time, market conditions, provisions of AB2923, and site conditions have <br />significantly changed, leading to a need to update and re-examine the prior work. The 4th and 5th <br />Cycle Housing Element designated this site for a minimum of 249 units at a minimum density of <br />30 dwelling units per acre; this number was revised and increased in the 6th Cycle Housing <br />Element, to a minimum of 555 units at a minimum density of 75 dwelling units per acre. In 2011 <br />and 2012, the City made progress on draft land use concepts along with draft development <br />standards and guidelines for the site. While this plan was not formally adopted, key development <br />standards were incorporated into the Hacienda Design Guidelines and Standards for other high <br />density housing sites in the vicinity (some of which have since been developed). The draft <br />concept included site planning, parking configurations, development scenarios, zoning <br />regulations, and development standards and guidelines for the BART site, to complement the <br />standards and guidelines that were adopted for sites nearby to the BART station. <br />Close coordination with BART staff is expected and essential to this process, since the success of <br />the project will depend on the City and BART coming to agreement on overall development <br />concepts, station access strategies, goals, timelines, and funding and maintenance <br />responsibilities. Other entities that would be invited to participate in the planning process include <br />the Hacienda Owners’ Association, the East Bay Regional Parks District (the Iron Horse Trail <br />intersects the BART station), the Tri-Valley – San Joaquin Valley Regional Rail Authority <br />(Valley Link, the proposed passenger rail service intending to connect with the <br />Dublin/Pleasanton BART station), Livermore Amador Valley Transit Authority (LAVTA), and <br />Alameda County Flood Control Water Conservation District (Zone 7). <br />The following is a scope of work consisting of tasks and deliverables for this project. <br />Task 1: Project Initiation <br />A.Project Kick-off: Participate in a project start-up and kick-off meeting with staff and <br />project stakeholders to establish and understand objectives, goals, and expectations. The <br />project start-up with staff will include a site tour with the project team (City staff, <br />consultant, BART staff, MTC staff) to discuss the site and begin discussion of key <br />EXHIBIT 5 <br />Page 16 of 21 <br />Docusign Envelope ID: 094A4C1A-13D7-44EA-BE42-B0F1E0142890Docusign Envelope ID: 663B3163-E73A-4E80-A759-F92FA9FC8D9D