My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
091625 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:30:34 PM
Creation date
10/10/2025 3:15:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/16/2025
DESTRUCT DATE
15Y
DOCUMENT NO
REGULAR MEETING AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 6 <br />construction contract: <br />1. Change Order No. 1 was for $592,277 for repaving Case Avenue from Valley Avenue <br />to Bernal Avenue as an added street to the project. Case Avenue was on the project list <br />for resurfacing but was removed from the project prior to the bid due to potential <br />insufficient funding concerns. After the bids were received, there was sufficient funding <br />to increase the project contingency with the intention of adding Case Avenue back to <br />the project as a change order at contract unit prices. A new layer of asphalt was placed <br />on 165,000 square feet of pavement, providing safe traffic circulation to Pleasanton <br />Middle and Hearst Elementary schools and prolonging the useful life of the pavement <br />on Case Avenue. <br />2. Change Order No. 2 for $230,871 was for repaving four additional streets. Adobe <br />Court, Singletree Court, Melody Court, and Garland Court were on the list for the <br />preventative maintenance program for 2024 and were scheduled for slurry seal in <br />September 2024. The pavement condition of these four courts has changed rapidly, <br />and slurry seal was not the best treatment for these courts, as it required a substantial <br />cost of pavement repair. Value engineering and pavement assessment were <br />performed, and it was determined that repaving these courts now, while the contractor <br />was in the area, was the best option instead of slurry sealing or deferring maintenance. <br />3. Change Order No. 3 for $60,000 was for additional work performed by O’Grady Paving <br />at the agreed price for the removal and off-haul of excess asphalt pavement material <br />during the course of the milling operation. The existing grades on Hopyard Road at <br />various locations did not allow for the proposed grades shown on the plans. Necessary <br />grade alterations to fit the field conditions resulted in extra time and off-hauling of <br />excess materials. <br />4. Change Order No. 4 for $79,500 was for additional work performed by the contractor to <br />fix the uneven pavement surface on West Las Positas Boulevard between Hacienda <br />Drive and Stoneridge Drive. Roadway settlement in both directions created severe dips <br />on the pavement that caused unfavorable riding conditions for vehicular traffic. This <br />section of roadway is on the City’s reconstruction schedule in 2026. These severe dips <br />were identified as high priorities for immediate repair. 265 tons of asphalt were placed <br />for pavement leveling at an agreed price of $300 per ton. <br />5. Change Order No. 5 for $95,865 was for compensation to O’Grady Paving for <br />additional work performed at the stockpile site on City-owned recycled paving material <br />located at Bernal Park required by the State Water Board, including grading of existing <br />stockpile, installation of silt fence and straw waddle, tarp covering, and area fencing. <br />6. Change Order No.6 for $75,000, was for the repair of seven damaged storm drains and <br />sanitary maintenance holes (MHs), and restoration of roadway pavement resulting from <br />a water break on Mirador Drive. The damaged MHs caused unfavorable driving <br />conditions for motorists and posed potential safety concerns that needed immediate <br />attention for repair. The water line break on Mirador Drive caused major damage to the <br />roadway, needing immediate restoration. The main water line was repaired by the city’s <br />crews; however, the roadway remained closed due to severe roadway pavement <br />damage. Roadway restoration was beyond the capacity of the City’s crews. O’Grady <br />Paving was selected to assist the City in restoring the pavement so the road could be <br />reopened to traffic in a timely manner. The Utilities Section requested this additional <br />work, which was performed under the existing contract with O’Grady Paving and paid <br />out of the Utilities’ Emergency Repair funds. <br />7. The balancing change order for $195,530 resulted from the difference between the <br />Page 112 of 264